NEXTDC S7 Data Centre, Eastern Creek
A 612 MW data centre at 1 Kangaroo Avenue, Eastern Creek
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Final Scoping Report - S7 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 612 MW data centre at 1 Kangaroo Avenue, Eastern Creek
The proponent, NEXTDC, proposes a data centre with an operational capacity of 612 MW at 1 Kangaroo Avenue, Eastern Creek, in the Blacktown City Council area. It would have three two-storey data storage buildings, 340 back-up diesel generators, diesel fuel storage, an on-site substation, site works and car parking. The site is about 385,734 m², of which about 255,137 m² is developable. No capital investment or job numbers are stated.
The case is at the stage of preparing an environmental impact statement (EIS). The proponent lodged a scoping report, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the proponent submits the EIS, which is exhibited so the public can make submissions. The department then assesses it. The power line to the TransGrid substation is not part of this application and needs separate approval.
- Operational capacity
- 612 MWPortal page
- Back-up diesel generators
- 340 generatorsPortal page
- Site area
- 385,734 m²Final Scoping Report - S7
- Developable area
- 255,137 m²Final Scoping Report - S7
The department's description
Construction and operation of a data centre with an operational capacity of 612 MW comprising of three, two-storey data storage buildings including 340 back-up diesel generators, diesel fuel storage, on-site substation, site works and car parking.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
27 documents in 4 folders, each on the NSW Planning Portal
Early Consultation11
- Appendix A - Concept Architectural Plan
- Appendix B - Design Report
- Appendix D - Acid Sulfate Soils Risk Assessment
- Appendix E - Preliminary Visual Advice
- Appendix F - Technical Note re Plant and Equipment
- Appendix G - SEARs Technical Assessment Methodology
- Enscape_2026-03-19-14-56-44_View 1.2_From Northeast
- Enscape_2026-03-19-14-57-05_View 5_From Northwest
- Enscape_2026-03-19-14-57-28_View 8_From Southwest
- Enscape_2026-03-19-14-57-45_View 9.2_From South
- Enscape_2026-03-19-14-58-05_View 12_Eastern Boundary
Request for SEARs2
SEARs4
Agency Advice10
- CPHR SEARs (SSD-113934740)
- EPA response - NextDC S7 data centre - 22.04.26
- HNSW ACH SSD-113934740 SEARs_AppId_14319
- Letter Out - NEXTDC S7 Data Centre
- NEXTDC S7 Data Centre, Eastern Creek
- NSW RFS advice on SEARs
- Response letter to DPHI
- SW DA Information Sheet (January 2026)
- SWC SEARs Response - SSD-113934740
- TfNSW Response SYD26-00371-01
What's near it
Where it is
- Suburb
- Eastern Creek
- Council area
- Blacktown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.