NEXTDC S7 Data Centre, Eastern Creek

A 612 MW data centre at 1 Kangaroo Avenue, Eastern Creek

Under way: at prepare eisData centresRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Final Scoping Report - S7 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 612 MW data centre at 1 Kangaroo Avenue, Eastern Creek

The proponent, NEXTDC, proposes a data centre with an operational capacity of 612 MW at 1 Kangaroo Avenue, Eastern Creek, in the Blacktown City Council area. It would have three two-storey data storage buildings, 340 back-up diesel generators, diesel fuel storage, an on-site substation, site works and car parking. The site is about 385,734 m², of which about 255,137 m² is developable. No capital investment or job numbers are stated.

The case is at the stage of preparing an environmental impact statement (EIS). The proponent lodged a scoping report, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the proponent submits the EIS, which is exhibited so the public can make submissions. The department then assesses it. The power line to the TransGrid substation is not part of this application and needs separate approval.

Operational capacity
612 MWPortal page
Back-up diesel generators
340 generatorsPortal page
Site area
385,734 m²Final Scoping Report - S7
Developable area
255,137 m²Final Scoping Report - S7

The department's description

Construction and operation of a data centre with an operational capacity of 612 MW comprising of three, two-storey data storage buildings including 340 back-up diesel generators, diesel fuel storage, on-site substation, site works and car parking.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.