On the map
State significant development

Eastern Creek Energy from Waste Facility

An energy from waste facility on Honeycomb Drive, Eastern Creek

Under way: at prepare eisEnergy: otherDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its TNG Energy from Waste - Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An energy from waste facility on Honeycomb Drive, Eastern Creek

The proponent proposes an energy from waste facility on Honeycomb Drive, Eastern Creek, in the Blacktown area. It would use moving grate technology to burn residual waste and generate electricity. It has an engineered capacity of up to 329,400 tonnes a year, with 300,000 tonnes a year of thermal treatment. The scoping report gives a capital investment of about $290 million, 500 construction jobs and 43 operational jobs, and 44 car parking spaces.

The proponent asked for the Secretary's environmental assessment requirements (SEARs) in a scoping report dated May 2020, and they were issued. The proponent is now preparing an environmental impact statement (EIS), so no submissions have been made. An earlier proposal on this land was refused by the Independent Planning Commission on 19 Jul 2018. Next, the EIS is to be exhibited for public submissions, then the department assesses it.

Capital investment
$290MTNG Energy from Waste - Scoping Report
Engineered capacity
329,400 tonnes a yearPortal page
Construction jobs
500 jobsTNG Energy from Waste - Scoping Report
Operational jobs
43 jobsTNG Energy from Waste - Scoping Report
Car parking spaces
44 car spacesTNG Energy from Waste - Scoping Report

The department's description

The proposal includes the construction and operation of an energy from waste facility implementing moving grate technology with an engineered capacity to treat up to 329,400 tonnes of residual waste fuel.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.