Eastern Creek Recycling Ecology Park

Decided: approved on 22 Nov 2009Waste

Where it is in the process

Approved on 22 Nov 2009

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination22 Nov 2009 (done)
  8. Approved22 Nov 2009

What it proposes

The department's description

Previously known as the Genesis Waste Management Facility.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

17 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 7 - Site Access & LayoutMP06_0139-Mod-7

Withdrawn: withdrawn

Its 23 documents

Its page on the Planning Portal

MOD 17 - Timber Yard ExpansionMP06_0139-Mod-17

Under way: at assessment

Modification to permit expansion of existing timber yard to provide additional space for waste timber storage and processing.

Its 11 documents

11 documents in 3 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 16 - Plant UpgradeMP06_0139-Mod-16

Decided: approved on 26 Nov 2025 by the department (team leader)

Relocation and upgrade of Leachate Treatment Plant

Its 19 documents

19 documents in 5 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Agency Advice6

See the 6 documents on the Planning Portal

Additional Information6

See the 6 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 9 - Operational AreaMP06_0139-Mod-9

Decided: approved on 30 Apr 2025 by the department (director)

Expansion of the operational boundary of the site to relocate existing waste processing activities, including a new timber processing building, extension of the road network and new hardstand area.

Its 51 documents

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 15 - RDF ProductionMP06_0139-Mod-15

Decided: approved on 18 Oct 2024 by the department (team leader)

Modification to permit the production of RDF comprising of mixed residual processed material from the MPC2 process, including minor modifications to MPC1 to provide additional capability to produce the RDF.

Its 37 documents

37 documents in 5 folders, each on the NSW Planning Portal

Modification Application13

See the 13 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information18

See the 18 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 14 - Gas to ElectricMP06_0139-Mod-14

Decided: approved on 1 May 2024 by the department (director)

Construction and operation of an onsite power generation plant to generate electricity from gas captured from the landfill cell using an array of four engines.

Its 18 documents

18 documents in 5 folders, each on the NSW Planning Portal

Modification Application5

See the 5 documents on the Planning Portal

Agency Advice7

See the 7 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 13 - Production of RDFMP06_0139-Mod-13

Decided: approved on 27 Oct 2022 by the department (director)

Modification seeks to permit: - production of refuse derived fuel from residual waste - construction of shelter domes and igloos over three storage bays in the existing approved timber yard

Its 29 documents

29 documents in 5 folders, each on the NSW Planning Portal

Modification Application11

See the 11 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information13

See the 13 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 12 - Gas FlareMP06_0139-Mod-12

Decided: approved on 11 Oct 2022 by the department (team leader)

modification to relocate the approved permanent flare compound

Its 13 documents

13 documents in 4 folders, each on the NSW Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 11 - Timber PickingMP06_0139-Mod-11

Decided: approved on 30 Aug 2022 by the department (team leader)

Installation of a manual picking station following optical sorting to facilitate further separation of engineered timber from the natural timber product stream.

Its 10 documents

10 documents in 5 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 10 - Landfill GasMP06_0139-Mod-10

Decided: approved on 11 Mar 2022 by the department (director)

Installation of a permanent landfill gas flare and associated collection system.

Its 15 documents

15 documents in 5 folders, each on the NSW Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 8 - Processing CentreMP06_0139-Mod-8

Decided: approved on 3 Mar 2021 by the department (director)

Amendments to the Materials Processing Centre 2 (previously known as the Pre-Sort Enclosure), including changes to the building footprint, tip floor operations and machinery. Also includes the relocation of weighbridges and car parking spaces.

Its 12 documents

12 documents in 4 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice4

See the 4 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 6 - Hours of OperationMP06_0139-Mod-6

Decided: approved on 29 Apr 2020 by the Independent Planning Commission · 60 submissions

/

Its 43 documents

Its page on the Planning Portal

Bingo Eastern Creek REP MOD 5 - Pre-Sort EnclosureMP06_0139-Mod-5

Decided: approved on 17 Mar 2016 by the Independent Planning Commission

/

Its 62 documents

62 documents in 4 folders, each on the NSW Planning Portal

Application28

See the 28 documents on the Planning Portal

Response to Submissions28

See the 28 documents on the Planning Portal

Recommendation4

See the 4 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 4 - Operating HoursMP06_0139-Mod-4

Decided: approved with conditions on 14 Dec 2013 by Dir(MIA)

Its 8 documents

Its page on the Planning Portal

Mod 3 - Area D Levels & StormwaterMP06_0139-Mod-3

Decided: approved on 5 Dec 2011 by the department (executive director)

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Uncategorised1

See the document on the Planning Portal

EA2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Administrative ChangesMP06_0139-Mod-2

Decided: approved on 9 Nov 2010 by the department (executive director)

Its 2 documents

2 documents in 1 folder, each on the NSW Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Design ChangesMP06_0139-Mod-1

Decided: approved on 30 Sep 2010 by the department (executive director)

Its 13 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.