State significant development

Narrabri Solar Farm

A 140 MW solar farm and battery at Logans Lane, Narrabri

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Narrabri Solar Farm Scoping V2.0 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 140 MW solar farm and battery at Logans Lane, Narrabri

The proponent proposes a solar farm of about 140 MW (direct current) with a 100 MW battery energy storage system holding up to 800 MWh, at 479 Logans Lane, Narrabri, in the Narrabri Shire Council area. The site is about 4 km from the township and covers about 315 ha, with a development footprint of 289 ha. It would connect to an existing 132 kV TransGrid line through a new on-site substation. No capital investment is stated in the text available.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The scoping report is dated June 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued and later extended and supplemented. Next, the proponent lodges the EIS, which is then exhibited so the public can make submissions. No submissions have been made so far. The department then assesses the project and decides it.

Solar farm capacity
140 MWPortal page
Battery power capacity
100 MWNarrabri Solar Farm Scoping V2.0
Battery storage capacity
800 MWhNarrabri Solar Farm Scoping V2.0
Project site area
315 haNarrabri Solar Farm Scoping V2.0
Development footprint
289 haNarrabri Solar Farm Scoping V2.0

The department's description

A 140MW solar farm with a battery energy storage system 100MW/800Mwh

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.