On the map
State significant development

Stoney Creek Battery Energy Storage System

A 125 MW battery on Stoney Creek Road, Narrabri

Decided: approved on 22 Sep 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 22 Sep 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination22 Sep 2026 (done)
  9. Approved22 Sep 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Conditions of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 125 MW battery on Stoney Creek Road, Narrabri

The project is a battery energy storage system of 125 MW and 1,000 MWh at 41 Stoney Creek Road, Narrabri, about 2 km north-east of the town centre in the Narrabri Shire area. It has 150 battery enclosures and 50 power conversion units, and connects underground to the adjacent Transgrid substation. The development footprint is 8.24 ha. The estimated cost is $366.3 million, with up to 48 construction jobs and four operational jobs.

The environmental impact statement (EIS) was exhibited from 20 Nov 2025 to 17 Dec 2025. The portal counts 79 submissions: 73 objecting, 5 supporting and 1 commenting. The proponent amended the application, and the department recommended approval. An executive director of the department, acting as the Minister's delegate, approved it on 22 Sep 2026 with conditions. Next, the proponent must meet those conditions, including a $3,000,000 voluntary planning agreement with the council, before construction.

Capital investment
$366.3MAssessment Report
Battery power capacity
125 MWAssessment Report
Battery storage capacity
1,000 MWhAssessment Report
Construction jobs
48 jobsAssessment Report
Operational jobs
4 jobsAssessment Report
Development footprint
8.24 haAssessment Report
Voluntary planning agreement
$3MAssessment Report
Battery enclosures
150 enclosuresAssessment Report

The department's description

Development of a 125 MW/1000MWh battery energy storage facility with associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

79 submissions: 67 from the public, 11 from organisations and 1 from public authorities

Object73
Support5
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

95 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS26
Response to Submissions6
Agency Advice34
Amendments5
Additional Information18
Determination3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.