Narrabri West Solar Farm
A 120 MW solar farm and battery at Culgoora Road, Narrabri
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Narrabri West Solar Farm Scoping Report FINAL_revised on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 120 MW solar farm and battery at Culgoora Road, Narrabri
The proponent proposes to build, operate and later decommission a solar farm of about 120 MW with a battery energy storage system of about 120 MW / 240 MWh at 707 Culgoora Road, Narrabri, in the Narrabri Shire. It would use up to 285,000 solar panels, with a substation and connections to two Essential Energy 66 kV lines. The disturbance footprint is about 400 ha. The scoping report gives a capital investment of more than $30 million, up to 150 construction workers and up to five operational workers.
The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued in 2026, and agencies have given advice on them. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.
- Solar farm capacity
- 120 MWNarrabri West Solar Farm Scoping Report FINAL_revised
- Battery capacity
- 240 MWhNarrabri West Solar Farm Scoping Report FINAL_revised
- Capital investment (more than)
- $30MNarrabri West Solar Farm Scoping Report FINAL_revised
- Construction jobs
- 150 jobsNarrabri West Solar Farm Scoping Report FINAL_revised
- Operational jobs
- 5 jobsNarrabri West Solar Farm Scoping Report FINAL_revised
- Solar panels
- 285,000 panelsNarrabri West Solar Farm Scoping Report FINAL_revised
- Disturbance footprint
- 400 haNarrabri West Solar Farm Scoping Report FINAL_revised
The department's description
Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 120 MW, a battery energy storage system (BESS) with a capacity of approximately 120 MW / 240 MWh, and ancillary infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
13 documents in 3 folders, each on the NSW Planning Portal
Request for SEARs1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.