On the map
State significant development

Narrabri West Solar Farm

A 120 MW solar farm and battery at Culgoora Road, Narrabri

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Narrabri West Solar Farm Scoping Report FINAL_revised on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW solar farm and battery at Culgoora Road, Narrabri

The proponent proposes to build, operate and later decommission a solar farm of about 120 MW with a battery energy storage system of about 120 MW / 240 MWh at 707 Culgoora Road, Narrabri, in the Narrabri Shire. It would use up to 285,000 solar panels, with a substation and connections to two Essential Energy 66 kV lines. The disturbance footprint is about 400 ha. The scoping report gives a capital investment of more than $30 million, up to 150 construction workers and up to five operational workers.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued in 2026, and agencies have given advice on them. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Solar farm capacity
120 MWNarrabri West Solar Farm Scoping Report FINAL_revised
Battery capacity
240 MWhNarrabri West Solar Farm Scoping Report FINAL_revised
Capital investment (more than)
$30MNarrabri West Solar Farm Scoping Report FINAL_revised
Construction jobs
150 jobsNarrabri West Solar Farm Scoping Report FINAL_revised
Operational jobs
5 jobsNarrabri West Solar Farm Scoping Report FINAL_revised
Solar panels
285,000 panelsNarrabri West Solar Farm Scoping Report FINAL_revised
Disturbance footprint
400 haNarrabri West Solar Farm Scoping Report FINAL_revised

The department's description

Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 120 MW, a battery energy storage system (BESS) with a capacity of approximately 120 MW / 240 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.