Morven Solar Farm

A 125 MW solar farm and battery at Coach Road, Culcairn

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 125 MW solar farm and battery at Coach Road, Culcairn

The proponent proposes a solar farm with a capacity of about 125 MW at 1258 Coach Road, Culcairn, in the Greater Hume Shire, about 11 km north of Gerogery. It would include a 125 MW/500MWh battery, a substation, solar arrays, inverters, access roads and a switch yard, and connect to an existing 132kV Transgrid line through the site. The site is about 220 ha of grazing land. The scoping report says the capital investment is more than $30 million, with no exact figure given. Sheep grazing under the panels is expected to continue.

The proponent lodged a scoping report in October 2024 and the Secretary's environmental assessment requirements (SEARs) have been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is to be exhibited for public submissions, then the department assesses it. No submissions have been made yet.

Solar farm capacity
125 MWScoping Report
Battery power capacity
125 MWScoping Report
Battery storage capacity
500 MWhScoping Report
Site area
220 haScoping Report

The department's description

Development of an 125 MW solar farm with battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.