Molong Battery Energy Storage System
A 150 MW battery at Deight Street, Molong
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 150 MW battery at Deight Street, Molong
The proponent proposes a battery energy storage system of 150 MW / 730 MWh at 1 Deight Street, Molong, in the Cabonne Shire area. It would have a maximum of 264 batteries in shipping containers and about 50 inverters, on a development footprint of about 9.56 ha. A new overhead line about 900 m long would connect it to the existing Molong substation. Construction would take about 14 months. No capital investment or job numbers are stated.
The environmental impact statement (EIS) is dated 30 Oct 2025 and drew 76 submissions: 74 objecting, 1 supporting and 1 commenting. The proponent has responded to submissions and lodged two amendment reports. The portal now shows the stage as More Information Required, and the department has issued requests for additional information. Next, the department assesses the project once it has the information it asked for, and then decides it.
- Battery power capacity
- 150 MWEnvironmental Impact Statement
- Battery storage capacity
- 730 MWhEnvironmental Impact Statement
- Maximum number of batteries
- 264 batteriesEnvironmental Impact Statement
- Development footprint
- 9.56 haEnvironmental Impact Statement
- Overhead transmission line length
- 900 mEnvironmental Impact Statement
- Native vegetation to be removed
- 5.89 haEnvironmental Impact Statement
- Submissions
- 76 submissionsPortal page
The department's description
Construction and operation of a 150 MW / 730 MWh BESS
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
76 submissions: 65 from the public and 11 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
105 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS27
- Appendix A - SEARs Compliance Table
- Appendix B - Maps and Plans
- Appendix C - Statutory Compliance Table
- Appendix D - EDC Cost Summary
- Appendix E - Mitigation Measures Table
- Appendix F - Biodiversity Development Assessment Report
- Appendix G - ACHAR Consultation Merge
- Appendix G - Aboriginal Cultural Heriatge Assessment (Redacted)
- Appendix H - Preliminary Air Quality Assessment
- Appendix I - Land Use Conflict Risk Assessment
- Appendix J - Landscape and Visual Impact Assessment
- Appendix K - Noise & Vibration Impact Assesement
- Appendix L - Transport Impact Assessment
- Appendix M - Flood Impact Assessment
- Appendix N - Hazard & Risk Assessment
- Appendix O - Social Impact Assessment Report
- Appendix P - Economic Impact Analysis
- Appendix Q - Waste Management Plan
- Appendix R - Engagement Summary Report
- Appendix S - Bushfire Risk Assessment Report
- Appendix T - Agricultural Impact Assessment
- Appendix U - Preliminary Site Investigation
- Appendix V - Surface and Groundwater Impact Assessment
- Appendix W - Onsite Facilities (Water and Sewerage)
- Appendix X - Land and Soil Capability Assessm
- Application Form
- Environmental Impact Statement
Response to Submissions13
- APPENDIX A - Submissions Register
- APPENDIX B - Mitigation Measures Table
- APPENDIX C - Amended BDAR RTS
- APPENDIX C - CPHR Comments Register RTS
- APPENDIX D - Updated Research Design Methodology
- APPENDIX E - Updated Onsite Facilities Report
- APPENDIX F - Updated Traffic Impact Assessment
- APPENDIX G - Addendum to LVIA
- APPENDIX H - Workforce Accomodation Strategy
- APPENDIX I - Technical Memorandum for NVIA - V2.0
- Molong BESS- Response to Submissions-v1.1
- Request RTS Letter
- Request for Additional Information_04062026_111850
Agency Advice43
- Advice on 2nd Amendment - Cabonne Council
- Advice on 2nd Amendment - TfNSW
- Advice on 2nd Amendment Report - DCA
- Advice on 2nd Amendment Report - FRNSW
- Advice on Amendment - Cabonne Council
- Advice on Amendment - Crown Lands
- Advice on Amendment - DCA Biodiversity
- Advice on Amendment - DCCEEW Water
- Advice on Amendment - DPIRD Ag
- Advice on Amendment - DPIRD Fisheries
- Advice on Amendment - FRNSW
- Advice on Amendment - Heritage ACH
- Advice on Amendment - Heritage Council
- Advice on Amendment - Marine Coast Est Flood
- Advice on Amendment - NSW Resources
- Advice on Amendment - TfNSW
- Advice on Amendment - WaterNSW
- Advice on EIS - CPHR
- Advice on EIS - Council
- Advice on EIS - Crown Lands
- Advice on EIS - DCCEEW Water
- Advice on EIS - DPI Fisheries
- Advice on EIS - DPIRD
- Advice on EIS - FRNSW
- Advice on EIS - HNSW ACH
- Advice on EIS - HNSW EH
- Advice on EIS - NSW Resources
- Advice on EIS - RFS
- Advice on EIS - TfNSW
- Advice on EIS - Water NSW
- CPHR Advice on SEARs
- Council Advice on SEARs
- DPI Fisheries Advice on SEARs
- DPIRD Ag Advice on SEARs
- FRNSW Advice on SEARs
- HNSW ACH Advice on SEARs
- HNSW Advice on SEARs
- NSW Crown Lands Advice on SEARs
- NSW DCCEEW Water Group Advice on SEARs
- NSW Resources Advice on SEARs
- TfNSW Advice on RtS and AR
- TfNSW Advice on SEARs
- Water NSW Advice on SEARs
Amendments17
- APPENDIX B - Site Plans
- APPENDIX C - Amended BDAR
- APPENDIX C - CPHR Comments Register
- APPENDIX D - Updated Land Use Conflict Risk Assessment
- APPENDIX E - Updated Agricultural Impact Assessment
- APPENDIX F - Updated Research Design Methodology
- APPENDIX G - Technical Memorandum for NVIA -v2.0
- APPENDIX H - Addendum to Landscape Visual Impact Assessment
- Amendment Acceptance Letter_19062026_103208
- Appendix A - Updated Project Description
- Molong BESS - Amendment Report - v1.1
- Molong BESS - Second Amendment Report (SAR)
- SAR - Appendix A - Updated Project Description.docx
- SAR - Appendix B - Updated Site Plans
- SAR - Appendix C - Updated BDAR
- SAR - Appendix D - Updated Archaeological Assessment
- SAR - Appendix E - Updated TIA
Additional Information2
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.