On the map
State significant development

Molong Battery Energy Storage System

A 150 MW battery at Deight Street, Molong

Under way: at assessmentEnergy: batteriesDistrict scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 150 MW battery at Deight Street, Molong

The proponent proposes a battery energy storage system of 150 MW / 730 MWh at 1 Deight Street, Molong, in the Cabonne Shire area. It would have a maximum of 264 batteries in shipping containers and about 50 inverters, on a development footprint of about 9.56 ha. A new overhead line about 900 m long would connect it to the existing Molong substation. Construction would take about 14 months. No capital investment or job numbers are stated.

The environmental impact statement (EIS) is dated 30 Oct 2025 and drew 76 submissions: 74 objecting, 1 supporting and 1 commenting. The proponent has responded to submissions and lodged two amendment reports. The portal now shows the stage as More Information Required, and the department has issued requests for additional information. Next, the department assesses the project once it has the information it asked for, and then decides it.

Battery power capacity
150 MWEnvironmental Impact Statement
Battery storage capacity
730 MWhEnvironmental Impact Statement
Maximum number of batteries
264 batteriesEnvironmental Impact Statement
Development footprint
9.56 haEnvironmental Impact Statement
Overhead transmission line length
900 mEnvironmental Impact Statement
Native vegetation to be removed
5.89 haEnvironmental Impact Statement
Submissions
76 submissionsPortal page

The department's description

Construction and operation of a 150 MW / 730 MWh BESS

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

76 submissions: 65 from the public and 11 from organisations

Object74
Support1
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

105 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS27
Response to Submissions13
Agency Advice43
Amendments17
Additional Information2

What's near it

Where it is

Suburb
Molong
Council area
Cabonne

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.