On the map
State significant development

Mullion Creek Wind Farm

A 247.5 MW wind farm with up to 33 turbines, Mullions Range

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 247.5 MW wind farm with up to 33 turbines, Mullions Range

The proponent proposes a wind farm of up to 33 turbines in Mullions Range State Forest, about 15.4 km north of Orange, in the Cabonne and Dubbo Regional council areas. Each turbine would stand up to 250 m to the blade tip. The installed capacity would be up to 247.5 MW. About 5.8 km of transmission line would link an on-site substation to a new switching station beside the existing Transgrid line. It would employ about 300 temporary workers over a 2-year construction phase and 8 permanent workers. No capital investment is stated.

The proponent lodged a scoping report in November 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS would be exhibited and the public could make submissions. No submissions have been made yet. The department would then assess the project.

Wind turbines
33 turbinesScoping Report
Installed capacity
247.5 MWScoping Report
Maximum blade-tip height
250 mScoping Report
Transmission line length
5.8 kmScoping Report
Construction workers
300 jobsScoping Report
Operational jobs
8 jobsScoping Report

The department's description

Development of a wind farm with up to 33 wind turbines and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.