On the map
State significant development

Manildra Solar Farm

Decided: approved on 3 Mar 2011Energy: solarNeighbourhood scale

Where it is in the process

Approved on 3 Mar 2011

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination3 Mar 2011 (done)
  8. Approved3 Mar 2011

What it proposes

The department's description

Development of a 50 MW solar farm and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Manildra Solar Farm Modification 3MP10_0122-Mod-3

Under way: at assessment · 48 submissions

Addition of 60MW/240MWh BESS and associated infrastructure.

Its 31 documents

31 documents in 4 folders, each on the NSW Planning Portal

Modification Application9

See the 9 documents on the Planning Portal

Exhibition1

See the document on the Planning Portal

Response to Submissions6

See the 6 documents on the Planning Portal

Agency Advice15

See the 15 documents on the Planning Portal

Its page on the Planning Portal

Manildra Solar MOD 2 - Manildra SolarMP10_0122-Mod-2

Decided: approved on 31 Aug 2015 by the department (executive director)

Changes to conditions including: - extending the project lapse date; - allowing string inverters to be installed; - changing noise monitoring requirements; and - updating the schedule of land.

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Recommendation1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Manildra Solar MOD 1 - Manildra SolarMP10_0122-Mod-1

Decided: approved on 25 Mar 2015 by the department (executive director)

Change solar panels from fixed to tracking panels and increasing the panel heights from 3.5 metres to 5 metres

Its 7 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Manildra
Council area
Cabonne

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.