Mixed use development - 36-46 George St and 16-24 and 26 Elsie St, Burwood
Three towers with 1,079 apartments at George St, Burwood
Where it is in the process
Approved on 16 Nov 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report - SSD-86182458 and Instrument of Determination - SSD-86182458 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Three towers with 1,079 apartments at George St, Burwood
The project is a mixed-use development of 41 to 47 storeys in three towers on two sites at 36-46 George Street and 16-26 Elsie Street, Burwood, in the Burwood Council area. It has 1,079 apartments, including 3% of residential gross floor area as affordable housing, about 8,782 m² of retail, commercial and child-care space and a 2,496 m² public plaza. It also has 1,473 basement car spaces. The department's report gives 1,945 construction jobs. The portal describes 900 dwellings; the approved figure is 1,079. No capital investment is clearly stated.
The environmental impact statement was exhibited from 10 June to 7 July. The portal lists 38 submissions: 35 objecting, 2 supporting and 1 commenting. The proponent responded in October 2026, and the department recommended approval. An Executive Director of the department, as the Minister's delegate, approved it on 16 Nov 2026 with conditions. Next, the proponent must meet the conditions before each construction certificate is issued.
- Apartments
- 1,079 dwellingsInstrument of Determination - SSD-86182458
- Construction jobs
- 1,945 jobsAssessment Report - SSD-86182458
- Retail, commercial and child-care floor space
- 8,782 m²Instrument of Determination - SSD-86182458
- Public plaza
- 2,496 m²Instrument of Determination - SSD-86182458
- Car parking spaces
- 1,473 car spacesInstrument of Determination - SSD-86182458
- Site area
- 10,265 m²Assessment Report - SSD-86182458
- Affordable housing share of residential floor area
- 3%Instrument of Determination - SSD-86182458
The department's description
Shop-top housing within 3 towers of between 32 and 43 storeys containing 98,665sqm commercial/residential floor area including 900 dwellings (3% affordable housing).
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
38 submissions: 37 from the public and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
124 documents in 9 folders, each on the NSW Planning Portal
Early Consultation2
Notice of Exhibition1
Request for SEARs2
SEARs3
EIS71
- 20240035_AD_SK01_0001-E-LOCATION PLAN
- Appendix A - SEARS table
- Appendix AA - Engineering Services Spatial (2)Part-1
- Appendix AA - Engineering Services Spatial (2)Part-2
- Appendix AAA -SDRP Meeting Minutes 1
- Appendix AAA -SDRP Meeting Minutes 2
- Appendix B - Compliance tables
- Appendix BB - Heritage Impact Statement
- Appendix BBB - Community Needs Statement
- Appendix C - Mitigation Measures
- Appendix CC - ESD report
- Appendix D - Survey
- Appendix DD - Flood Risk Management Plan
- Appendix E - Architectural Plans
- Appendix EE - Geotechnical Investigation
- Appendix F - Architectural Design Report
- Appendix FF - Groundwater Seepage Analysis
- Appendix G - Remediation Action Plan
- Appendix GG - Green Travel Plan
- Appendix H - Arboricultural Impact Assessment
- Appendix HH - Hazardous Material Survey - Site A
- Appendix HH - Hazardous Material Survey - Site B
- Appendix I - Noise and Vibration Report
- Appendix II - Services Infrastructure Report - 2
- Appendix II - Services Infrastructure Report - Site APart-1
- Appendix II - Services Infrastructure Report - Site APart-2
- Appendix II - Services Infrastructure Report - Site APart-3
- Appendix II - Services Infrastructure Report -1
- Appendix J - ACHAR Waiver (Redacted)
- Appendix JJ - Integrated Water Management Plan
- Appendix K - Aviation Impact Assessment Report
- Appendix KK - Landscape Plans
- Appendix L - BASIX
- Appendix L - BASIX 1
- Appendix L - BASIX 2
- Appendix L - BASIX 3
- Appendix L - BASIX 4
- Appendix LL - Landscape Report
- Appendix M - BCA and Access Report
- Appendix N - BDAR Waiver
- Appendix N - BDAR Waiver - DPHI determination letter
- Appendix N - BDAR Waiver - Determination
- Appendix NN - Social Impact Assessment
- Appendix O - Construction & Demolition Waste Management Plan
- Appendix OO - Civil and Stormwater Plans
- Appendix P - Preliminary Structural Advice
- Appendix PP - Traffic and Parking Report
- Appendix Q - Connecting with Country report (Redacted)
- Appendix QQ - Vertical Transport Memo
- Appendix R - Construction Traffic Management Plan
- Appendix RR - Visual Impact Assessment
- Appendix S - Acid Sulfate Soils Assessment
- Appendix SS - Pedestrian Wind Assessment Pt 1
- Appendix SS - Pedestrian Wind Assessment Pt 2
- Appendix T - Detailed Site Investigation
- Appendix TT - Railway Impact Assessment
- Appendix U - CPTED Assessment
- Appendix UU - Concurrent Rezoning Report
- Appendix V - Cranage Plans
- Appendix W - Economic Impact Assessment
- Appendix WW - Operational Waste Management Plan
- Appendix X - Estimated Development Cost
- Appendix XX - Education and Care Services Regs
- Appendix Y - Engagement Report
- Appendix YY - Embodied Emissions Form
- Appendix Z - Community and Stakeholder Engagement Plan
- Appendix ZZ - Solar Reflectivity Analysis
- Application_20260513073355
- Environmental Impact Statement
- NABERS Agreement
- Net Zero
Response to Submissions2
Agency Advice19
- Ausgrid comments
- Burwood Council comment - Insufficient engagement
- Burwood Council comment - Urban Design 1
- Burwood Council comment - Urban Design 2
- CPHR comments
- DCA RtS comments
- DCA Water comments
- Fire & Rescue NSW comments
- Heritage NSW comments
- MCEF RtS comments
- MCEF comments
- NSW SES RtS comments
- NSW SES comments
- RtS - Burwood Council comments
- Sydney Airport Corporation comments
- Sydney Water DA Information Sheet for Proponent
- Sydney Water comments
- TfNSW comments
- TfNSW-Sydney Trains comments
Additional Information18
- Architectural PlansPart-1
- Architectural PlansPart-2
- Architectural PlansPart-3
- Architectural RFI Response
- Architectural ReportPart-1
- Architectural ReportPart-2
- Architectural ReportPart-3
- Community Housing Provider letter
- Flood Impact and Risk Assessment
- Heritage Impact Statement
- Hydrogeological report incl DMP & GSA
- Landscape Design Report - Site Image 25.09.2026
- Landscape Drawing Package - Site Image 25.09.2026
- Planning RFI response
- Public Art Report - Site Image 25.09.2026
- RFI letter - SSD-86182458
- Response to NSW SES -Flooding
- Traffic and Parking Report R1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.