On the map
State significant development

Mixed-use development with in-fill affordable housing, 2-4 Burleigh Street and 20-24 Railway Parade, Burwood

A 39-storey tower with a hotel and 48 apartments, Burwood

Decided: approved on 8 May 2026HomesNeighbourhood scale

Where it is in the process

Approved on 8 May 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination8 May 2026 (done)
  9. Approved8 May 2026

What it proposes

AI summary. Written from this project's page and its SSD Instrument of Consent Holder and SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 39-storey tower with a hotel and 48 apartments, Burwood

The project is a 39-storey mixed-use building at 2-4 Burleigh Street and 20-24 Railway Parade, Burwood, in the Burwood council area, near Burwood Station. It has 48 dual key apartments, 18 of them affordable housing, a 120-room hotel and office space, over a five-level basement. It reaches 143.9 m. The department gives an estimated development cost of $117,979,065, and 215 construction jobs and 35 operational jobs.

The environmental impact statement (EIS) was exhibited from 30 Apr 2025 to 27 May 2025. The department received 29 public submissions, an objection from the council and agency advice. The proponent responded on 18 Aug 2025 with design changes. An Executive Director of the department, acting for the Minister, approved it on 8 May 2026. The consent is deferred: a planning agreement with the council and design changes must be settled first.

Estimated development cost
$118MSSD-SSI Assessment Report
Apartments
48 dwellingsSSD-SSI Assessment Report
Affordable apartments
18 dwellingsSSD-SSI Assessment Report
Building height
143.9 mSSD-SSI Assessment Report
Storeys
39 storeysSSD-SSI Assessment Report
Hotel rooms
120 roomsSSD-SSI Assessment Report
Construction jobs
215 jobsSSD-SSI Assessment Report
Operational jobs
35 jobsSSD-SSI Assessment Report

The department's description

Mixed-Use Development comprising a hotel, commercial premises and a residential flat building.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

34 submissions: 32 from the public, 1 from organisations and 1 from public authorities

Object22
Support10
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

113 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS47
Response to Submissions25
Agency Advice14
Amendments3
Additional Information15
Determination5

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.