Mixed Use Development at 8-12 George St, Burwood
A 40-storey tower with 112 apartments at George Street, Burwood
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its EIS and Concurrent Rezoning Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 40-storey tower with 112 apartments at George Street, Burwood
The proponent proposes to demolish three single-storey houses at 8, 10 and 12 George Street, Burwood, in the Burwood Council area, and build a 40-storey mixed use tower on a site of 793.8 m². It would have 112 apartments, including 16 affordable dwellings for 15 years, a restaurant and bar, shops and offices at the base, and seven basement levels. A concurrent rezoning seeks to lift the height limit from 70 m to 135.5 m and the floor space ratio from 6:1 to 15.84:1. No capital investment is stated.
The environmental impact statement (EIS) is dated 29 Jul 2026. The proposal has since had a response to submissions and further information, and the department is assessing it. It drew 31 submissions: 27 objecting, 2 supporting and 2 commenting. Next, the department's assessment report and recommendation follow, then a decision by the Minister or a delegate.
- Apartments
- 112 dwellingsEIS and Concurrent Rezoning Report
- Affordable dwellings
- 16 dwellingsEIS and Concurrent Rezoning Report
- Building height
- 40 storeysEIS and Concurrent Rezoning Report
- Proposed maximum height limit
- 135.5 mEIS and Concurrent Rezoning Report
- Current maximum height limit
- 70 mEIS and Concurrent Rezoning Report
- Site area
- 793.8 m²EIS and Concurrent Rezoning Report
- Basement levels
- 7 levelsEIS and Concurrent Rezoning Report
The department's description
Demolition of existing structures and construction of mixed-use tower consisting of residential accommodation including affordable housing and non-residential uses including a restaurant, bar, cafe and office premises.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
31 submissions: 29 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
103 documents in 8 folders, each on the NSW Planning Portal
Early Consultation4
Notice of Exhibition1
Request for SEARs2
EIS47
- Appendix A - SEARs Compliance Table
- Appendix AA - Integrated Water Management Plan
- Appendix B - Statutory Compliance Table
- Appendix BB - Stormwater Concept Design
- Appendix C - Mitigation Measures Compliance Table
- Appendix CC - Flood Impact Risk Assessment
- Appendix D - Architectural Plans (part 4)
- Appendix D - Architectural Plans - Part 1
- Appendix D - Architectural Plans - Part 2
- Appendix D - Architecural Plans (part 3)
- Appendix DD - Ecologically Sustainable Development Report
- Appendix E - Architectural Design Report
- Appendix EE - BASIX Certificate - 8-12 George St
- Appendix F - Survey Plan - 8-12 George Street, Burwood
- Appendix FF-EDC Report - 8-12 George St (Public)
- Appendix G - Landscape Plans - 8-12 George Street, Burwood
- Appendix H - Landscape Report - 8-12 George Street, Burwood
- Appendix HH - Wind Assessment - 8-12 George Street, Burwood
- Appendix I - Arboricultural Report
- Appendix II - Preliminary Plan of Management
- Appendix J - BDAR Waiver Request Report
- Appendix JJ - Infrastructure Funding Report
- Appendix K BDAR Waiver 8-12 George Street, Burwood
- Appendix KK - IDMS Report
- Appendix L - Aboriginal Desktop Due Diligence Assessment
- Appendix LL - BCA Report - 8-12 George Street, Burwood
- Appendix M - Statement of Heritage Impact
- Appendix MM - Economic Impact Assessment
- Appendix N - Archaeological Assessment
- Appendix NN - Accessibility Letter
- Appendix O - Engagement Outcomes Report
- Appendix OO - Aviation Assessment
- Appendix P - Social Impact Assessment
- Appendix Q - Transport Impact Assessment
- Appendix QQ - Road and Drainage Design
- Appendix R - Construction Traffic Management Plan
- Appendix RR - Hydrogeological Assessment
- Appendix S - Green Travel Plan
- Appendix T - Acoustic Assessment
- Appendix U - Geotechnical Assessment - Desktop Report
- Appendix U - Geotechnical Assessment - Full Report
- Appendix V - Preliminary Site Investigation
- Appendix W - Detailed Site Investigation
- Appendix X - Remediation Action Plan
- Appendix Y - Operational Waste Management Plan
- Appendix Z- C&D Waste Management Plan
- EIS and Concurrent Rezoning Report
Response to Submissions2
Agency Advice8
- Ausgrid Response - 8-12 George St, Burwood
- Burwood Council Response - 8-12 George St, Burwood
- CASA Response - 8-12 George St, Burwood
- DCA Technical Advisory Response - 8-12 George St, Burwood
- NSW Police Response - 8-12 George St, Burwood
- Sydney Airport Response - 8-12 George St, Burwood
- Sydney Trains Response - 8-12 George St, Burwood
- TfNSW Response - 8-12 George St, Burwood
Additional Information37
- 8-12 George St, Burwood - Request for Further Information
- Appendix 1 - Detailed response to Agency feedback
- Appendix 10 - Revised Plan of Management
- Appendix 11 - Wind Letter
- Appendix 12 - Wind Tunnel Report
- Appendix 13 - Aviation Response Letter
- Appendix 14 - Structural Engineering Letter
- Appendix 15 - Revised OWMP
- Appendix 15a -Waste Options Report
- Appendix 16 - Revised Mitigation Measures Table
- Appendix 17 - Acoustic RFI Letter
- Appendix 18 - Drainage Design
- Appendix 18 - Road Design
- Appendix 18a - Revised Drainage Design Letter
- Appendix 19 - Heritage RtS Letter
- Appendix 2 - Revised Architectural PlansPart-1
- Appendix 2 - Revised Architectural PlansPart-2
- Appendix 2 - Revised Architectural PlansPart-3
- Appendix 2 - Revised Architectural PlansPart-4
- Appendix 2 - Revised Architectural PlansPart-5
- Appendix 2 - Revised Architectural PlansPart-6
- Appendix 2 - Revised Architectural PlansPart-7
- Appendix 2 - Revised Architectural PlansPart-8
- Appendix 2 - Revised Architectural PlansPart-9
- Appendix 20 -Revised Infrastructure Funding Report
- Appendix 21 - Lift Capacity
- Appendix 22 - Ausgrid Response
- Appendix 23 - Crane plans
- Appendix 3 - Architectural RtS Report
- Appendix 4 - Revised Landscape Plans
- Appendix 5 - Landscape RtS Letter
- Appendix 6 - Revised TIA
- Appendix 6a - Revised CTMP
- Appendix 7 - Social Impact Assessment Addendum
- Appendix 8 - Geotechnical Monitoring Plan
- Appendix 9 - Dewatering RtS Letter
- Response to Submissions Report
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.