On the map
State significant development

Mixed Use Development 24 Parkes Street, Harris Park

A mixed use residential tower at 24 Parkes Street, Harris Park

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SSD SEARs Industry Specific Cover Letter on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A mixed use residential tower at 24 Parkes Street, Harris Park

The proponent proposes a mixed use residential tower, including affordable housing, at 24 Parkes Street, Harris Park, in the City of Parramatta. A rezoning would run at the same time to change the height and floor space ratio on the site. No capital investment, number of homes, height or floor area is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The department issued the Secretary's environmental assessment requirements (SEARs) on 9 Jun 2026. They ask for a wind study, an economic feasibility assessment and at least three alternative scenarios with lower heights and floor space ratios. No submissions have been made. Next, the proponent lodges the EIS, which is then exhibited so the public can make submissions. The department then assesses it.

The department's description

Proposed SSDA mixed use residential tower (inc affordable housing) with concurrent rezoning to amend height and floor space ratio.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.