Mixed-use development at 163-165 George Street, Parramatta
A 50-storey tower and rezoning at George Street, Parramatta
Where it is in the process
At sears
What it proposes
AI summary. Written from this project's page and its 26 06 05 - Scoping Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 50-storey tower and rezoning at George Street, Parramatta
The proponent proposes a staged mixed-use development at 163-165 George Street, Parramatta, in the City of Parramatta area, with about 700 apartments across three towers. The first stage is a 50-storey tower of up to 175 m with 400 apartments, at least 10% of them affordable housing. A rezoning would run alongside it, changing the Parramatta Local Environmental Plan (LEP) to allow a floor space ratio of 6.6:1 and a height of 175 m, compared with the current 14 m and 21 m. No capital investment is stated.
The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs). The scoping report is dated June 2026, and the portal lists issued SEARs. No exact date is given. Next, the proponent prepares an environmental impact statement (EIS), which is then exhibited so the public can make submissions. There are no submissions yet.
- Dwellings across all stages
- 700 dwellingsPortal page
- Stage 1 dwellings
- 400 dwellingsPortal page
- Stage 1 building height
- 50 storeysPortal page
- Maximum building height sought
- 175 m26 06 05 - Scoping Report
- Maximum floor space ratio sought
- 6.6 to 126 06 05 - Scoping Report
- Minimum affordable housing in Stage 1
- 10 per cent26 06 05 - Scoping Report
The department's description
Concept application for the staged delivery of 700 residential dwellings across three mixed-use buildings. Stage 1 SSDA for the construction of a 50-storey mixed-use building comprising 400 residential dwellings including 10% affordable housing
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
8 documents in 2 folders, each on the NSW Planning Portal
Request for SEARs4
What's near it
Where it is
- Suburb
- Parramatta
- Council area
- Parramatta
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.