On the map
State significant development

Mixed-use development at 163-165 George Street, Parramatta

A 50-storey tower and rezoning at George Street, Parramatta

Under way: at searsHomesDistrict scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 26 06 05 - Scoping Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 50-storey tower and rezoning at George Street, Parramatta

The proponent proposes a staged mixed-use development at 163-165 George Street, Parramatta, in the City of Parramatta area, with about 700 apartments across three towers. The first stage is a 50-storey tower of up to 175 m with 400 apartments, at least 10% of them affordable housing. A rezoning would run alongside it, changing the Parramatta Local Environmental Plan (LEP) to allow a floor space ratio of 6.6:1 and a height of 175 m, compared with the current 14 m and 21 m. No capital investment is stated.

The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs). The scoping report is dated June 2026, and the portal lists issued SEARs. No exact date is given. Next, the proponent prepares an environmental impact statement (EIS), which is then exhibited so the public can make submissions. There are no submissions yet.

Dwellings across all stages
700 dwellingsPortal page
Stage 1 dwellings
400 dwellingsPortal page
Stage 1 building height
50 storeysPortal page
Maximum building height sought
175 m26 06 05 - Scoping Report
Maximum floor space ratio sought
6.6 to 126 06 05 - Scoping Report
Minimum affordable housing in Stage 1
10 per cent26 06 05 - Scoping Report

The department's description

Concept application for the staged delivery of 700 residential dwellings across three mixed-use buildings. Stage 1 SSDA for the construction of a 50-storey mixed-use building comprising 400 residential dwellings including 10% affordable housing

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.