On the map
State significant development

Gregory Place Build-to-Rent

A 320-home build-to-rent concept at Gregory Place, Harris Park

Under way: at recommendationHomesDistrict scale

Where it is in the process

At recommendation

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (current stage)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 320-home build-to-rent concept at Gregory Place, Harris Park

The proponent seeks concept approval for a build-to-rent development at 2A Gregory Place, Harris Park, in the City of Parramatta. It has seven building envelopes of 2 to 8 storeys on a site of 19,485 m². It is designed for a maximum of 320 dwellings, with 50% of them affordable housing for 15 years. The estimated development cost is $156,886,297. No building work is proposed now; each future building needs its own application.

The environmental impact statement was exhibited from 2 Aug 2022 to 29 Aug 2022. The proponent later cut the homes from 483 to 320 and lowered the height. The project is at the recommendation stage. The department's assessment report of September 2026 found it approvable, subject to conditions. The Independent Planning Commission is to decide it. The portal records 104 submissions, all objecting.

Estimated development cost
$156.9MAssessment Report
Maximum dwellings
320 dwellingsPortal page
Original dwellings proposed
483 dwellingsAssessment Report
Affordable share of homes
50%Assessment Report
Construction jobs
860 jobsAssessment Report
Operational jobs
20 jobsAssessment Report
Site area
19,485 m²Assessment Report
Maximum car parking spaces
367 car spacesAssessment Report

The department's description

Proposed concept development for an affordable housing and build-to- rent development comprising approximately 320 dwellings within seven freestanding two to eight storey buildings.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

104 submissions: 93 from the public, 9 from organisations and 2 from public authorities

Object104
Support0
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

129 documents in 10 folders, each on the NSW Planning Portal

Early Consultation11
Notice of Exhibition1
Request for SEARs1
SEARs1
EIS41
Response to Submissions1
Agency Advice22
Amendments38
Additional Information9
Recommendation4

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.