Holloway Battery Energy Storage System

A 250 MW battery on Eathorpe Road, Armidale

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 250 MW battery on Eathorpe Road, Armidale

The proponent proposes a battery energy storage system at 112 Eathorpe Road, Armidale, about 6 km south-east of Armidale in the Armidale Regional Council area. It would hold up to 250 MW and 1,000 MWh, with a four-hour duration. It would use lithium-ion batteries, inverters, transformers and a switching station. A transmission line, underground or overhead, would run to Transgrid's Armidale Substation, and Eathorpe Road may be upgraded. Construction is expected to take 12 to 18 months, with an operational life of about 30 years. No capital investment is stated.

The proponent lodged a scoping report dated 17 Sep 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS is to be exhibited for public submissions, and the department then assesses the project. No submissions have been made yet.

Battery power capacity
250 MWScoping Report
Battery storage capacity
1,000 MWhScoping Report
Distance south-east of Armidale
6 kmScoping Report
Operational life
30 yearsScoping Report

The department's description

Development of a 250 MW / 1,000 MWh battery energy storage system and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.