On the map
State significant development

Griffith Bio-hub

A bioenergy facility on Murrumbidgee Avenue, Hanwood

Under way: at prepare eisEnergy: otherNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report – Griffith Biohub on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A bioenergy facility on Murrumbidgee Avenue, Hanwood

The proponent proposes a bioenergy facility at 2607 Murrumbidgee Avenue, Hanwood, in the Griffith City Council area, about 7 kilometres south of Griffith town centre. It would use anaerobic digestion to process up to 120,000 tonnes a year of organic waste, mainly chicken litter, into biomethane for the Jemena gas network. The scoping report estimates at least 450 TJ of biomethane a year. Works would cover about 6 ha of a 20 ha site. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated 6 Jan 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Organic waste processed
120,000 tonnes a yearPortal page
Biomethane produced (at least)
450 TJ a yearScoping Report – Griffith Biohub
Site area
20 haScoping Report – Griffith Biohub
Works area
6 haScoping Report – Griffith Biohub
Combined heat and power plant
1,000 kWeScoping Report – Griffith Biohub

The department's description

Construction and operation of a bioenergy facility utilising anaerobic digestion technology to process up to 120,000 tpa of organic waste to produce biomethane for injection into the Jemena gas network.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.