Griffith Battery Energy Storage System

A 100 MW battery at Bob Irvin Road, Yoogali, near Griffith

Under way: at assessmentEnergy: batteriesDistrict scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery at Bob Irvin Road, Yoogali, near Griffith

The proponent proposes a battery energy storage system with a nominal capacity of 100 MW / 1000 MWh at 15 Bob Irvin Road, Yoogali, about 7 km south-east of Griffith in the Griffith City Council area. It would connect to the grid through a 132 kV link to the existing Griffith Substation, by underground and overhead cables still being investigated. Up to 150 full time equivalent staff would work on site a day at the peak of construction, and up to 2.5 in operation. No capital investment is stated.

The environmental impact statement (EIS) was lodged on 13 Nov 2025 and drew 74 submissions, all objecting. The proponent responded to submissions and lodged an amendment report. The department is assessing the project and has asked for more information, with requests dated 15 Jun 2026, 2 Oct 2026 and 27 Oct 2026. Next, the proponent replies, and the department prepares its assessment report. The decision is then made.

Battery power capacity
100 MWEnvironmental Impact Statement
Battery storage capacity
1,000 MWhEnvironmental Impact Statement
Peak construction staff
150 full time equivalent staffEnvironmental Impact Statement
Operational staff
2.5 full time equivalent staffEnvironmental Impact Statement
Grid connection voltage
132 kVEnvironmental Impact Statement
Submissions objecting
74 submissionsPortal page

The department's description

Development of a 100 MW / 1000 MWh battery storage system and associated infrastructure including grid connection.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

74 submissions: 64 from the public and 10 from organisations

Object74
Support0
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

93 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation4
Request for SEARs1
SEARs3
EIS17
Response to Submissions11
Agency Advice44
Amendments9
Additional Information3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.