On the map
State significant development

Forbes Nutrient Return Centre

Expanding the Forbes Nutrient Return Centre to 90,000 tonnes

Under way: at prepare eisAgricultureNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Expanding the Forbes Nutrient Return Centre to 90,000 tonnes

The proponent proposes to expand the existing Central West Nutrient Return Centre at 14 Walker Drive, Forbes, in Forbes Shire, to process up to 90,000 tonnes a year of organic waste, including food and garden organics, animal waste, manure and biosolids. The facility is now approved for 30,000 tonnes a year. The project would add a new processing shed, four composting bunkers, an anaerobic digestion plant and a biogas power plant. Operational staff would rise from 25 to 35. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, following a scoping report dated 18 Sep 2026. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Proposed throughput
90,000 tonnes a yearScoping Report
Currently approved throughput
30,000 tonnes a yearScoping Report
Proposed operational staff
35 jobsScoping Report
Existing operational staff
25 jobsScoping Report
Site area
34 haScoping Report
Composting bunkers
4 bunkersScoping Report

The department's description

Expansion of existing facility to permit 90,000 tpa waste receival including food and garden organics, animal waste, manure and biosolids. Construction of new processing shed, composting bunkers, anaerobic digestion plant, and biogas power generation

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

4 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs2
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.