Collector Wind Farm

Decided: approved with conditions on 2 Dec 2013Other

Where it is in the process

Approved With Conditions on 2 Dec 2013

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination2 Dec 2013 (done)
  8. Approved With Conditions2 Dec 2013

What it proposes

The department's description

60-80 turbine wind farm, with the capacity to generate up to 160 MW of electricity, plus ancillary infrastructure (including underground cabling, substation, grid connection, and access tracks).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 3 - Temporary Concrete Batch PlantMP10_0156-Mod-3

Decided: approved on 16 Aug 2019 by the department (director)

Installation and operation of a temporary concrete batch plant on the site, enabling a more efficient construction process for the wind farm and significantly reducing heavy vehicle movements in the area by avoiding trucking concrete from Goulburn.

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Collector Wind MOD 2 - Grid Connection & RoadsMP10_0156-Mod-2

Decided: approved on 15 May 2019 by the department (executive director) · 11 submissions

The proposed modification involves: - minor adjustments to the electricity grid connection infrastructure - road works required to upgrade Lerida Road South

Its 7 documents

Its page on the Planning Portal

Collector Wind MOD 1 - Collector WindMP10_0156-Mod-1

Decided: approved on 22 Jul 2016 by the Independent Planning Commission · 55 submissions

The proposed modification involves changes to: - the layout of ancillary infrastructure; - blade diameter lengths; - biodiversity offsetting and clearing limits, and noise limits, to reflect current NSW Government policy.

Its 18 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.