Collector Wind Farm
Where it is in the process
Approved With Conditions on 2 Dec 2013
What it proposes
The department's description
60-80 turbine wind farm, with the capacity to generate up to 160 MW of electricity, plus ancillary infrastructure (including underground cabling, substation, grid connection, and access tracks).
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
3 changes to the project after its decision, each assessed as a case of its own, newest first.
MOD 3 - Temporary Concrete Batch PlantMP10_0156-Mod-3
Installation and operation of a temporary concrete batch plant on the site, enabling a more efficient construction process for the wind farm and significantly reducing heavy vehicle movements in the area by avoiding trucking concrete from Goulburn.
Its 4 documents
4 documents in 3 folders, each on the NSW Planning Portal
Modification Application1
Determination2
Consolidated Consent1
Collector Wind MOD 2 - Grid Connection & RoadsMP10_0156-Mod-2
The proposed modification involves: - minor adjustments to the electricity grid connection infrastructure - road works required to upgrade Lerida Road South
Its 7 documents
7 documents in 5 folders, each on the NSW Planning Portal
Application1
Response to Submissions1
Recommendation1
Determination3
Collector Wind MOD 1 - Collector WindMP10_0156-Mod-1
The proposed modification involves changes to: - the layout of ancillary infrastructure; - blade diameter lengths; - biodiversity offsetting and clearing limits, and noise limits, to reflect current NSW Government policy.
Its 18 documents
18 documents in 5 folders, each on the NSW Planning Portal
Application2
Response to Submissions1
Recommendation4
Determination3
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
84 documents in 11 folders, each on the NSW Planning Portal
Application7
Response to Submissions3
Recommendation5
Determination3
Management Plans and Strategies11
Independent Reviews and Audits2
Notifications3
Other Documents6
What's near it
Where it is
- Suburb
- Cullerin
- Council area
- Upper Lachlan Shire
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.