A 250 MW solar farm and battery at Lerida, near Gunning

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 250 MW solar farm and battery at Lerida, near Gunning

The proponent proposes to build, operate and decommission a solar farm of about 250 MW with a battery energy storage system of up to 500 MW and 2000 MWh. The land is at 721 Collector Road and 196 Lucks Lane, Lerida, about 5 km south-east of Gunning in the Upper Lachlan Shire. The site is about 1,143 ha and the indicative development footprint is 573 ha. It would connect to the existing 330 kV Transgrid transmission line through a new on-site substation. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report dated November 2025 was lodged, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. The department then assesses the project.

Solar farm capacity
250 MWScoping Report
Battery power capacity
500 MWScoping Report
Battery storage capacity
2,000 MWhScoping Report
Project site area
1,143 haScoping Report
Indicative development footprint
573 haScoping Report

The department's description

The construction, operation and decommissioning of a 250 MW solar farm with a Battery Energy Storage System with a capacity of 500 MW / 2000 MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.