On the map
State significant development

Willavale Park Battery Energy Storage System

A 300 MW battery at 20541 Hume Highway, Wollogorang

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 MW battery at 20541 Hume Highway, Wollogorang

The proponent proposes a battery energy storage system with a capacity of 300 MW / 1,200 MWh at 20541 Hume Highway, Wollogorang, about 22 km west of Goulburn in the Goulburn Mulwaree area. It would use 324 lithium-ion battery units in a fenced compound with a substation, and connect to the existing 330 kV Yass-Marulan transmission line. The environmental impact statement (EIS) gives a development footprint of 26.14 ha, an average construction workforce of 70, a peak of 100 and five operational jobs. No capital investment is stated here.

The EIS is dated 3 Nov 2025 and has been exhibited. It drew 74 submissions: 72 objecting and 2 commenting. The case is now at the stage where the proponent responds to submissions and prepares an amendment report. Next, the department assesses the project with advice from other agencies, then it is decided.

Battery power capacity
300 MWPortal page
Battery storage capacity
1,200 MWhPortal page
Battery units
324 unitsEIS
Development footprint
26.14 haEIS
Peak construction workforce
100 jobsEIS
Operational workforce
5 jobsEIS
Submissions received
74 submissionsPortal page
Submissions objecting
72 submissionsPortal page

The department's description

Development of a 300 MW / 1200 MWh battery energy storage system and associated infrastructure and connection works

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

74 submissions: 62 from the public, 10 from organisations and 2 from public authorities

Object72
Support0
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

50 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS16
Response to Submissions1
Agency Advice30

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.