State significant development

Central Barangaroo Early Works Phase 2 - Excavation and perimeter wall

Excavation and perimeter wall for Central Barangaroo

Decided: approved on 23 Dec 2025Mixed useDistrict scale

Where it is in the process

Approved on 23 Dec 2025

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination23 Dec 2025 (done)
  9. Approved23 Dec 2025

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Excavation and perimeter wall for Central Barangaroo

The project is the second phase of early works at Central Barangaroo, on a 5.2 ha site off Hickson Road in the City of Sydney. It would excavate the site to remove about 210,000 m³ of material and build a perimeter retaining wall, a ground slab and waterproofing, with works joining the Barangaroo Metro Station. The department gives an estimated development cost of $252,000,000 and 837 construction jobs over 28 months. No building, basement or public domain is approved.

The environmental impact statement (EIS) was exhibited from 9 Jul 2025 to 7 Aug 2025. It drew 6 submissions: 3 objecting, 1 supporting and 2 commenting. The proponent amended the project to reduce the excavation depth and move the western wall east. The department recommended approval, and its Director approved it on 23 Dec 2025, as the Minister's delegate, with conditions. Next, the proponent must meet those conditions before and during construction.

Estimated development cost
$252MAssessment Report
Construction jobs
837 jobsAssessment Report
Material to be excavated
210,000 m³Assessment Report
Site area
5.2 haAssessment Report
Construction time
28 monthsAssessment Report

The department's description

Phase 2 early works for bulk excavation and site establishment works for the installation of a perimeter retention wall in addition to remediation, archaeological investigations and ancillary construction plant and equipment.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

6 submissions: 3 from the public, 2 from organisations and 1 from public authorities

Object3
Support1
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

98 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation3
Request for SEARs2
SEARs1
EIS38
Response to Submissions18
Agency Advice30
Determination3
Management Plans and Strategies1
Notifications1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.