AI summary. Written from this project's page and its WTJ26-170 Scoping Report Addendum - 845-901 Mamre Road on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 1.4 GW data centre campus at Mamre Road, Kemps Creek
The proponent proposes a data centre campus at 845-901 Mamre Road, Kemps Creek, in the Penrith area. It would have six two-storey data centres, an administration building and a substation, with total power consumption of about 1.4 GW. Buildings would be up to 25.5 m high on a site of about 117.47 ha. The Local Collector Road would be moved to the western edge of the site. No capital investment or job numbers are stated.
The proposal began as a single four-storey data centre of about 144 MW, with environmental assessment requirements (SEARs) issued on 10 Aug 2026. On 2 Oct 2026 the proponent sent a scoping report addendum asking the department to amend the SEARs for the larger campus. The case is at the amended SEARs stage and has no public submissions. Next, the department issues amended SEARs, and the proponent prepares an environmental impact statement (EIS) for public exhibition.
- Total power consumption
- 1.4 GWWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
- Data centre buildings
- 6 buildingsWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
- Maximum building height
- 25.5 mWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
- Site area
- 117.47 haWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
- Original proposal: power consumption
- 144 MWWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
The department's description
Construction and operation of a data centre campus with a total power consumption of 1.4 GW comprising six two-storey data centre buildings, administration building, substation and Local Collector Road realignment.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
17 documents in 4 folders, each on the NSW Planning Portal
Early Consultation7
- A1 - Scoping Summary Table
- A2 - Preliminary Concept Architectural Plans
- A3 - Acoustic Response to DPHI Scoping Report Comments
- APPENDIX 2 - AMENDED CONCEPT PLANS - WTJ26-170
- APPENDIX 3 - COLLECTOR ROAD REALIGNMENT - WTJ26-170
- APPENDIX 4 - TECHNICAL NOTE - WTJ26-170
- Scoping Report v5 - 859-901 Mamre Road, Kemps Creek
Request for SEARs2
SEARs4
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.