CDC Data Centre Campus, Kemps Creek

A 1.4 GW data centre campus at Mamre Road, Kemps Creek

Under way: at prepare eisData centresRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its WTJ26-170 Scoping Report Addendum - 845-901 Mamre Road on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 1.4 GW data centre campus at Mamre Road, Kemps Creek

The proponent proposes a data centre campus at 845-901 Mamre Road, Kemps Creek, in the Penrith area. It would have six two-storey data centres, an administration building and a substation, with total power consumption of about 1.4 GW. Buildings would be up to 25.5 m high on a site of about 117.47 ha. The Local Collector Road would be moved to the western edge of the site. No capital investment or job numbers are stated.

The proposal began as a single four-storey data centre of about 144 MW, with environmental assessment requirements (SEARs) issued on 10 Aug 2026. On 2 Oct 2026 the proponent sent a scoping report addendum asking the department to amend the SEARs for the larger campus. The case is at the amended SEARs stage and has no public submissions. Next, the department issues amended SEARs, and the proponent prepares an environmental impact statement (EIS) for public exhibition.

Total power consumption
1.4 GWWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
Data centre buildings
6 buildingsWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
Maximum building height
25.5 mWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
Site area
117.47 haWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road
Original proposal: power consumption
144 MWWTJ26-170 Scoping Report Addendum - 845-901 Mamre Road

The department's description

Construction and operation of a data centre campus with a total power consumption of 1.4 GW comprising six two-storey data centre buildings, administration building, substation and Local Collector Road realignment.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.