On the map
State significant development

Brewongle Solar Farm

A 131 MW solar farm at O'Connell Road, Bathurst

Under way: at assessmentOtherDistrict scale

Where it is in the process

At assessment

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (current stage)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Brewongle Solar - Environmental Assessment Requirements on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 131 MW solar farm at O'Connell Road, Bathurst

The proposal is a solar farm with an estimated capacity of 131 MW, using photovoltaic (PV) panels, on the property "Euarra" on O'Connell Road, Bathurst, in the Bathurst Regional Council area. It would include associated infrastructure and a grid connection. No capital investment, site area, number of jobs or height is stated.

The Secretary's environmental assessment requirements (SEARs) were issued on 26 September 2017. They tell the proponent what its environmental impact statement (EIS) must cover, including biodiversity, heritage, land, visual effects, noise, transport, water and hazards. The case is now listed as under assessment, and no public submissions are recorded. Next, the proponent prepares the EIS, which is exhibited so the public can make submissions. The proponent then responds, and the department assesses the project before a decision is made.

Solar farm capacity
131 MWBrewongle Solar - Environmental Assessment Requirements

The department's description

Development of a 131 MW solar farm and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

2 documents in 2 folders, each on the NSW Planning Portal

Early Consultation1
SEARs1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.