On the map
State significant development

Bowmans Creek Wind Farm Stage 2

A 21-turbine wind farm at Bowmans Creek, near Singleton

Under way: at response to submissionsEnergy: windNeighbourhood scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 21-turbine wind farm at Bowmans Creek, near Singleton

Bowmans Creek Wind Farm Stage 2 proposes up to 21 three-blade wind turbines, each with a blade tip up to 250 m above ground. It would connect to the approved Stage 1 wind farm through a 330 kV substation, overhead and underground power lines, internal roads and other works. Road upgrades are also proposed along the transport route. The site is mainly in the Muswellbrook Shire, with part in Singleton Shire. No capital investment or generating capacity is stated.

The proponent's environmental impact statement (EIS) is dated August 2026. The project has drawn 149 public submissions: 145 objecting, 2 supporting and 2 commenting. The case is now at the response to submissions stage, in which the proponent answers the issues raised and may amend the project. The department then assesses it and decides, or refers it to the Independent Planning Commission.

Wind turbines
21 turbinesEnvironmental Impact Statement
Maximum blade-tip height
250 mEnvironmental Impact Statement
Substation voltage
330 kVEnvironmental Impact Statement
Submissions
149 submissionsPortal page
Submissions objecting
145 submissionsPortal page

The department's description

Development of a wind farm with up to 21 wind turbines and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

149 submissions: 135 from the public, 12 from organisations and 2 from public authorities

Object145
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

63 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs19
EIS25
Response to Submissions1
Agency Advice16

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.