Boro Solar Farm

A 150 MW solar farm and battery at Boro Road, Boro

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 150 MW solar farm and battery at Boro Road, Boro

The proponent proposes a solar farm of up to 150 MW with a battery energy storage system of 250 MW and 1,000 MWh, off Boro Road, Boro. It would occupy up to 420 ha of private and Crown land in the Goulburn Mulwaree and Queanbeyan-Palerang Regional council areas. The scoping report puts the estimated development cost at more than $30 million, so the total cost is not stated.

The case is at the stage of preparing an environmental impact statement (EIS). The scoping report, dated 25 Jun 2025, supported the request for the Secretary's environmental assessment requirements (SEARs), which have been issued. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. No submissions have been made yet. The department then assesses the project and the Minister's delegate decides it.

Solar farm capacity
150 MWPortal page
Battery power capacity
250 MWScoping Report
Battery storage capacity
1,000 MWhScoping Report
Project area
420 haScoping Report
Estimated development cost (more than)
$30MScoping Report

The department's description

Development of a 150 MW solar farm and associated infrastructure, including battery storage facility.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.