A 200 MW solar farm and battery at Bendemeer

Under way: at recommendationEnergy: solarDistrict scale

Where it is in the process

At recommendation

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (current stage)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW solar farm and battery at Bendemeer

The proponent proposes a 200 MW solar farm with a battery energy storage system of up to 150 MW and 300 MWh, at 4409-4461 Oxley Highway, Bendemeer, about 46 km north-east of Tamworth in the Tamworth Regional Council area. It would use about 354,330 solar panels on a 607 ha site, with a 369 ha development footprint, and connect to an existing 330 kV transmission line. About 55 ha of native vegetation would be cleared. The department gives a cost of $438 million, up to 307 construction jobs and about 15 operational jobs.

The environmental impact statement (EIS) was exhibited from 27 Jul 2023 to 24 Aug 2023. The portal counts 234 submissions: 121 objecting, 109 supporting and 4 commenting. The proponent amended the project in 2025. The department's assessment report, published in November 2026, found it approvable subject to conditions. The Independent Planning Commission is to decide, because more than 100 people objected.

Estimated development cost
$438MAssessment Report
Solar farm capacity
200 MWAssessment Report
Battery power capacity
150 MWAssessment Report
Battery storage capacity
300 MWhAssessment Report
Peak construction jobs
307 jobsAssessment Report
Operational jobs
15 jobsAssessment Report
Site area
607 haAssessment Report
Development footprint
369 haAssessment Report

The department's description

Development of a 200 MW solar farm with energy storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

234 submissions: 221 from the public and 13 from organisations

Object121
Support109
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

101 documents in 8 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs3
EIS21
Response to Submissions3
Agency Advice40
Amendments17
Additional Information13
Recommendation3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.