New England REZ Transmission Project
New England REZ 500 kV transmission lines to Muswellbrook
Where it is in the process
At exhibition, since 15 Oct 2026
Open for comment until 26 Nov 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its EIS Executive Summary on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
New England REZ 500 kV transmission lines to Muswellbrook
EnergyCo proposes new transmission lines and energy hubs to connect renewable energy projects in the New England Renewable Energy Zone to the existing network at Bayswater Power Station, near Muswellbrook. The project would run about 300 km across eight council areas, with dual 500 kV lines, 500 kV and 330 kV lines to five energy hubs, and a maintenance facility near Tamworth. Its project area is about 10,928 ha, and about 3,579 ha would be disturbed during construction. Stage 1 would provide 2.4 GW of transfer capacity and Stage 2 a further 3.6 GW. No capital investment is stated.
The project is declared critical State significant infrastructure. The environmental impact statement (EIS) is on exhibition from 15 Oct 2026 to 26 Nov 2026, and no submissions are recorded yet. Next, the proponent responds to submissions, the department assesses the project, and the Minister for Planning and Public Spaces decides.
- Project length
- 300 kmEIS Executive Summary
- Total project area
- 10,928 haEIS Executive Summary
- Land disturbed in construction
- 3,579 haEIS Executive Summary
- Stage 1 transfer capacity
- 2.4 GWEIS Executive Summary
- Stage 2 added capacity
- 3.6 GWEIS Executive Summary
- Total transfer capacity
- 6 GWEIS Executive Summary
- Energy hubs
- 5 energy hubsEIS Executive Summary
- Operational footprint
- 471 haEIS Executive Summary
The department's description
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
81 documents in 4 folders, each on the NSW Planning Portal
Notice of Exhibition2
Application1
SEARs26
- Advice on SEARs - Crown Lands
- Advice on SEARs - DPIRD Agriculture
- Advice on SEARs - DPIRD Fisheries
- Advice on SEARs - FRNSW
- Advice on SEARs - Heritage NSW ACH
- Advice on SEARs - Liverpool Plains Shire Council
- Advice on SEARs - RFS
- Advice on SEARs - Subsidence Advisory
- Advice on SEARs - Telco
- Advice on SEARs - Upper Hunter Shire Council
- Advice on SEARs - Walcha Council
- Amended SEARs
- Amended advice - Armidale Council
- Amended advice - CASA
- Amended advice - CPHR
- Amended advice - DCCEEW Water
- Amended advice - Heritage Council
- Amended advice - Muswellbrook Shire Council
- Amended advice - NSW EPA
- Amended advice - NSW Resources
- Amended advice - Singleton Council
- Amended advice - Tamworth Council
- Amended advice - Transport for NSW
- Amended advice - Uralla Shire Council
- Amended advice - WaterNSW
- CSSI Statement of Reasons and Declaration
EIS52
- EIS
- EIS (compressed)
- EIS Appendices A - F
- EIS Appendices A - F (compressed)
- EIS Executive Summary
- EIS Lodgement Form
- EnergyCo Notice of Application
- Tech Report 15 Flooding (compressed)
- Tech Report 16 Groundwater (compressed)
- Tech Report 3 Historical Heritage (compressed)
- Tech Report 5 Landscape and Visual (compressed)
- Tech Report 5 LandscapeVisual App F-K(compressed)
- Tech Report 5 LandscapeVisual AppA-E(compressed)
- Tech Report 7 Traffic and Transport (compressed)
- Technical Report 1 Biodiversity
- Technical Report 1 Biodiversity (compressed)
- Technical Report 1 Biodiversity Figures
- Technical Report 1 Biodiversity Figures (compressed)
- Technical Report 10 Preliminary Risk Screening
- Technical Report 11 Aviation Impact Assessment
- Technical Report 12 Bushfire Risk Assessment
- Technical Report 13 Electric and Magnetic Fields Assessment
- Technical Report 14 Surface Water Assessment
- Technical Report 15 Flooding Impact Assessment
- Technical Report 16 Groundwater Impact Assessment
- Technical Report 17 Air Quality Impact Assessment
- Technical Report 18 Greenhouse Gas Impact Assessment
- Technical Report 19 Contamination (compressed)
- Technical Report 19 Contamination Impact Assessment
- Technical Report 2 Aboriginal Heritage
- Technical Report 2 Aboriginal Heritage (compressed Appendices A-Q)
- Technical Report 2 Aboriginal Heritage (compressed)
- Technical Report 2 Aboriginal Heritage App A-F
- Technical Report 2 Aboriginal Heritage App G
- Technical Report 2 Aboriginal Heritage App H-J
- Technical Report 2 Aboriginal Heritage App K
- Technical Report 2 Aboriginal Heritage App L-P
- Technical Report 2 Aboriginal Heritage App Q
- Technical Report 20 Anthrax Assessment
- Technical Report 21 Equine Health Assessment
- Technical Report 22 Equine CIC Assessment
- Technical Report 3 Historical Heritage
- Technical Report 4 Social (compressed)
- Technical Report 4 Social Impact Assessment
- Technical Report 5 Landscape and Visual
- Technical Report 5 Landscape and Visual App A-E
- Technical Report 5 Landscape and Visual App F-K
- Technical Report 6 Agriculture (compressed)
- Technical Report 6 Agriculture Impact Assessment
- Technical Report 7 Traffic and Transport Impact Assessment
- Technical Report 8 Economic Impact Assessment
- Technical Report 9 Noise and Vibration Impact Assessment
What's near it
Where it is
- Suburb
- Kentucky
- Council areas
- Muswellbrook, Upper Hunter Shire, Tamworth Regional, Uralla, Singleton, Walcha, Armidale Regional
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.