New England REZ Transmission Project

New England REZ 500 kV transmission lines to Muswellbrook

Under way: at exhibitionTransmissionRegional scale

Where it is in the process

At exhibition, since 15 Oct 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition15 Oct 2026 (current stage)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

Open for comment until 26 Nov 2026. Anyone can make a submission on its page on the Planning Portal.

What it proposes

AI summary. Written from this project's page and its EIS Executive Summary on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

New England REZ 500 kV transmission lines to Muswellbrook

EnergyCo proposes new transmission lines and energy hubs to connect renewable energy projects in the New England Renewable Energy Zone to the existing network at Bayswater Power Station, near Muswellbrook. The project would run about 300 km across eight council areas, with dual 500 kV lines, 500 kV and 330 kV lines to five energy hubs, and a maintenance facility near Tamworth. Its project area is about 10,928 ha, and about 3,579 ha would be disturbed during construction. Stage 1 would provide 2.4 GW of transfer capacity and Stage 2 a further 3.6 GW. No capital investment is stated.

The project is declared critical State significant infrastructure. The environmental impact statement (EIS) is on exhibition from 15 Oct 2026 to 26 Nov 2026, and no submissions are recorded yet. Next, the proponent responds to submissions, the department assesses the project, and the Minister for Planning and Public Spaces decides.

Project length
300 kmEIS Executive Summary
Total project area
10,928 haEIS Executive Summary
Land disturbed in construction
3,579 haEIS Executive Summary
Stage 1 transfer capacity
2.4 GWEIS Executive Summary
Stage 2 added capacity
3.6 GWEIS Executive Summary
Total transfer capacity
6 GWEIS Executive Summary
Energy hubs
5 energy hubsEIS Executive Summary
Operational footprint
471 haEIS Executive Summary

The department's description

Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

81 documents in 4 folders, each on the NSW Planning Portal

Notice of Exhibition2
Application1
SEARs26
EIS52

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.