On the map
State significant development

Beauchamp Road, Hillsdale, Affordable Housing

179 affordable homes at 68-80 Beauchamp Road, Hillsdale

Decided: approved on 11 Aug 2026HomesNeighbourhood scale

Where it is in the process

Approved on 11 Aug 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination11 Aug 2026 (done)
  9. Approved11 Aug 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

179 affordable homes at 68-80 Beauchamp Road, Hillsdale

The project is two 8 storey residential flat buildings with 179 affordable housing apartments, two basement levels, landscaping and communal open space, at Beauchamp Road, Hillsdale, in the Bayside Council area. It replaces an existing townhouse development of 39 social housing dwellings. The estimated development cost is $125,880,127 and the project is expected to create 441 construction jobs. The buildings are 31.6 m and 30.1 m high.

The environmental impact statement (EIS) was exhibited from 9 Dec 2025 and drew 43 submissions: 36 objecting, 3 supporting and 4 commenting. The proponent responded in March 2026 and gave more information on 4 Jun 2026. The department's assessment found the project acceptable. The Minister approved it on 11 Aug 2026, with conditions. Next, the conditions must be met before work starts and during construction.

Estimated development cost
$125.9MAssessment Report
Affordable housing apartments
179 dwellingsAssessment Report
Construction jobs
441 jobsAssessment Report
Building A height
31.6 mAssessment Report
Trees to be removed
24 treesAssessment Report
Bicycle spaces
192 bicycle spacesDevelopment Consent

The department's description

Construction of a residential flat building comprising social and market dwellings.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

43 submissions: 39 from the public, 3 from organisations and 1 from public authorities

Object36
Support3
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

64 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1
SEARs2
EIS29
Response to Submissions14
Agency Advice8
Additional Information6
Determination4

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.