A two-storey warehouse at Former Qenos site, Banksmeadow
Where it is in the process
At sears
What it proposes
AI summary. Written from this project's page and its Scoping Report_Former Qenos Botany Redevelopment Stage 3 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A two-storey warehouse at Former Qenos site, Banksmeadow
The proponent proposes a two-storey warehouse and distribution centre with offices, car parking, landscaping and stormwater works on the former Qenos site at 16-20B Beauchamp Road, Banksmeadow, in the Bayside Council area. This is Stage 3 of a staged redevelopment of the former chemical plant within the Botany Industrial Park. The Stage 3 development area is 37,946 m² within a 30.66 ha lot. No capital investment, floor area or job numbers are stated, though the scoping report says the estimated development cost is more than $50 million.
The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs), following a scoping report dated October 2026. No public submissions have been made. Next, the department issues the SEARs, then the proponent prepares an environmental impact statement (EIS), which is exhibited for public submissions before the department assesses it.
- Stage 3 development area
- 37,946 m²Scoping Report_Former Qenos Botany Redevelopment Stage 3
- Lot 109 site area
- 30.66 haScoping Report_Former Qenos Botany Redevelopment Stage 3
The department's description
The proposal seeks approval for the construction and operation of a two-storey warehouse and distribution centre with ancillary office accommodation, car parking, landscaping, stormwater management, and associated site infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
17 documents in 2 folders, each on the NSW Planning Portal
Early Consultation16
- Appendix A_EDC Summary Report
- Appendix B_Survey Plans
- Appendix C_Concept Architectural Plans
- Appendix D_Detailed Site Investigation_Part1
- Appendix D_Detailed Site Investigation_Part2
- Appendix D_Detailed Site Investigation_Part3
- Appendix D_Detailed Site Investigation_Part4
- Appendix D_Detailed Site Investigation_Part5
- Appendix D_Detailed Site Investigation_Part6
- Appendix D_Detailed Site Investigation_Part7
- Appendix D_Detailed Site Investigation_Part8
- Appendix D_Detailed Site Investigation_Part9
- Appendix E_Remedial Action Plan
- Appendix F_ACHA - Public
- Appendix G_Historical Archaeological Impact Assessment
- Site Plan_Former Qenos Botany Site
Request for SEARs1
What's near it
Where it is
- Suburb
- Banksmeadow
- Council area
- Bayside
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.