Aquila Wind Farm

Aquila Wind Farm of up to 48 turbines, near Euchareena

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Aquila Wind Farm of up to 48 turbines, near Euchareena

The proponent proposes a wind farm of up to 48 turbines, each 6.2 MW, with an installed capacity of up to 300 MW. Each turbine would have a blade tip up to 250 m high. It would also include a battery of about 100 MW, with two hours of storage. The site is about 2.5 km south-east of Stuart Town and 2 km north-east of Euchareena, in the Dubbo Regional Council area. The scoping report says it would employ about 300 temporary workers during a 2-year construction phase and 15 permanent workers in operation. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies and councils. No submissions have been made yet. Next, the EIS is to be exhibited and the public can make submissions. The proponent then responds, and the department assesses the project.

Wind turbines
48 turbinesScoping Report
Wind farm installed capacity
300 MWScoping Report
Battery capacity
100 MWScoping Report
Maximum blade-tip height
250 mScoping Report
Construction jobs
300 jobsScoping Report
Operational jobs
15 jobsScoping Report

The department's description

Construction and operation of a wind farm with up to 48 wind turbines, battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project