AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 48,157 m² warehouse at Luddenham Road, Orchard Hills
The project is a storage and distribution warehouse with ancillary offices, at 221-235 Luddenham Road, Orchard Hills, in the Penrith local government area. The assessment report gives a total floor area of 48,157 m² and a maximum height of 39 m, on a site of about 10.4 ha. It has 329 parking spaces and 36 covered loading docks, and would operate 24 hours a day, 7 days a week. The estimated development cost is $171,807,325, with about 150 construction jobs and 429 operational jobs.
The environmental impact statement (EIS) was exhibited from 21 Aug 2025 to 17 Sep 2025. The department received 5 submissions: 1 objecting, 1 supporting and 3 commenting. The proponent responded with updated traffic, noise and stormwater studies. A director of the department, acting for the Minister, approved the project on 1 Oct 2026, with conditions. Next, the proponent must meet those conditions before and during construction and operation.
- Capital investment
- $171.8MAssessment Report
- Construction jobs
- 150 jobsAssessment Report
- Operational jobs
- 429 jobsAssessment Report
- Gross floor area
- 48,157 m²Assessment Report
- Maximum building height
- 39 mAssessment Report
- Covered loading docks
- 36 docksAssessment Report
- Vehicle parking spaces
- 329 spacesAssessment Report
- Site area
- 10.4 haAssessment Report
The department's description
Construction and operation of a warehousing facility.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
4 submissions: 2 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Alspec Warehousing Facility Mod 1 - Development ContributionsSSD-81434988-Mod-1
Correct error in condition A25 relating to development contributions
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
113 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs2
SEARs2
EIS44
- Appendix A - SEARs Compliance Table
- Appendix AA - Landscape Plans
- Appendix B - Penrith City Council Pre-lodgement Advice
- Appendix BB - Lighting Plan
- Appendix C - Statutory Compliance Table
- Appendix CC - Net Zero Statement
- Appendix D - DCP Compliance Table
- Appendix DD - Noise and Vibration Impact Assessment
- Appendix E - Mitigation Measures Table
- Appendix EE - Social Impact Assessment
- Appendix F - Clause 4.6 Variation Request
- Appendix FF - Survey Plan
- Appendix G - Aboriginal Heritage Letter
- Appendix GG - Sustainability Report
- Appendix H - Embodied Emissions Materials Form
- Appendix HH - Traffic Impact Assessment
- Appendix I - Air Quality Impact Assessment
- Appendix II - Infrastructure and Utilities Plan Letter
- Appendix J - Architectural Plans_Part1
- Appendix J - Architectural Plans_Part2
- Appendix J - Architectural Plans_Part3
- Appendix J - Architectural Plans_Part4
- Appendix J - Architectural Plans_Part5
- Appendix JJ - Visual Impact Assessment
- Appendix K - Design Report
- Appendix KK - Waste Management Plan
- Appendix L - BCA Report
- Appendix LL - NABERS Agreement to Rate
- Appendix M - Biodiversity Management Plan Letter
- Appendix N - Bushfire Assessment
- Appendix O - Civil Plans
- Appendix P - Construction Traffic Management Plan
- Appendix Q - Contamination Report
- Appendix R - Dangerous Goods and Hazards Assessment
- Appendix S - EDC Report Updated
- Appendix T - Engagement Outcomes Report
- Appendix U - Fire Safety Strategy
- Appendix V - Flooding Risk
- Appendix W - Green Travel Plan
- Appendix X - Groundwater Impact Assessment
- Appendix Y - Historical Heritage Letter of Advice
- Appendix Z - Integrated Water Cycle Management Report
- Application_20250721225811
- EIS - Storage and Distribution Warehouse
Response to Submissions22
- Appendix A Cost of Development Report April 2026
- Appendix A Master Plan & Construction timeframe
- Appendix B Traffic Impact Assessment
- Appendix B Traffic Impact Assessment April 2026
- Appendix C Noise Impact Assessment
- Appendix D Construction Traffic Management Plan
- Appendix E Waste Management Plan
- Appendix F Bulk Earthworks Integrated Water Cycle
- Appendix F Sediment & Erosion Control Plan April 2026
- Appendix G Integrated Water Cycle Management Report
- Appendix G Music model background letter April 2026
- Appendix H Noise and Vibration Impact Assessment April 2026
- Appendix H Survey Sydney Metro corridor
- Appendix I Music Model
- Appendix J Updated Traffic Circulation diagram
- Appendix K Driveway widths
- Appendix L Waste clearance heights
- Architectural Plans April 2026
- Landscape Plans April 2026
- Request RTS Letter
- Response to Submissions April 2026
- Response to Submissions Report_Alspec Warehousing Facility
Agency Advice20
- CPHR Advice (SSD-81434988)
- CPHR Comments - RTS (SSD-81434988)
- CPHR Comments - RTS 2 (SSD-81434988)
- CPHR response to EIS
- DCCEEW Water Response to EIS
- FRNSW response to EIS
- HNSW ACH response to EIS
- Letter Out - FRNSW (SSD-81434988)
- NSW RFS response to EIS
- Penrith Council Response to EIS
- SSD-81434988 - Council Response to RTS - Alspec Warehouse
- SSD-81434988 - Council Response to Updated RTS - Alspec
- SSD-81434988 Sydney Metro Conditions
- Sydney Metro (corridor) Response to EIS
- Sydney Metro (place making) Response to EIS
- Sydney Metro Response
- Sydney Water DA Information Sheet (September 2025)
- Sydney Water Response to EIS
- TfNSW Response SYD25-00446-03
- TfNSW Response to EIS
Additional Information14
- 20260826 Updated Architectural Set
- Amended Civil Plan C2003
- CPHR Advice (SSD-81434988)
- CPHR Comments 20 March 2026
- Council Response to RTS
- Flow Duration Curve Development Scale
- June 26 Sediment and Erosion Control Letter
- June 26 Sediment and Erosion Control Report
- Request for Additional Information 191225
- Request for Additional Information090626
- Request for Additional Information190326
- Request for Additional Information200326
- SSDA RFI Response H&H
- Sydney Metro Response to RTS
Determination6
Notifications1
What's near it
Where it is
- Suburb
- Orchard Hills
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.