On the map
State significant development

Alspec Manufacturing Warehouse (Orchard Hills)

A 24-hour aluminium manufacturing warehouse at Orchard Hills

Decided: approved on 23 Jan 2026Industry and warehousesNeighbourhood scale

Where it is in the process

Approved on 23 Jan 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination23 Jan 2026 (done)
  9. Approved23 Jan 2026

What it proposes

AI summary. Written from this project's page and its SSD-69845208 Assessment Report and SSD-69845208 Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 24-hour aluminium manufacturing warehouse at Orchard Hills

The project is a manufacturing warehouse and distribution facility at 221-235 Luddenham Road, Orchard Hills, in the Penrith area, within the Alspec Industrial Business Park. It includes an aluminium extrusion press and powder coating paint line, and would run 24 hours a day. It can process up to 17,774 tonnes of aluminium a year. The building has a floor area of 40,271 m² and reaches 24.73 m. The estimated capital investment is $71 million, with about 200 construction jobs and 396 operational jobs.

The environmental impact statement was exhibited from 2 Oct 2024 to 29 Oct 2024 and drew 2 comments: one from an organisation and one from a public authority. The proponent responded to submissions. The department found the project approvable, and its Acting Director approved it on 23 Jan 2026, as the Minister's delegate. Next, the proponent must meet the consent's conditions, including traffic and noise plans, before building and operating.

Capital investment
$71MSSD-69845208 Assessment Report
Construction jobs
200 jobsSSD-69845208 Assessment Report
Operational jobs
396 jobsSSD-69845208 Assessment Report
Annual processing capacity
17,774 tonnes a yearSSD-69845208 Instrument of Consent
Maximum building height
24.73 mSSD-69845208 Assessment Report
Car parking spaces
388 car spacesSSD-69845208 Assessment Report

The department's description

Construction and operation of a manufacturing warehouse and distribution facility, including an aluminium extrusion and paint line, within the Alspec Industrial Business Park

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

2 submissions: 1 from organisations and 1 from public authorities

Object0
Support0
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

136 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs2
EIS42
Response to Submissions28
Agency Advice29
Additional Information25
Determination5
Management Plans and Strategies2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.