Aldington Road Data Centre

A two-building data centre campus at Aldington Road, Kemps Creek

Under way: at prepare eisData centresRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Aldington Road Data Centre_Scoping Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A two-building data centre campus at Aldington Road, Kemps Creek

The proponent proposes a hyperscale data centre campus on two lots at 54-72 and 74-104 Aldington Road, Kemps Creek, in the Penrith council area. It would have two data centre buildings up to about 36 m high and three storeys, with an IT load of about 342 to 360 MW. The site is about 30 ha, of which about 14 ha is developable. It includes a 1,000 MVA substation and a switching station. The scoping report gives an estimated cost of about $4 to 5 billion.

The proponent sought the Secretary's environmental assessment requirements (SEARs) for a smaller scheme on one lot, which were issued on 24 Apr 2026. A scoping report dated August 2026 asks to amend them for the larger two-lot scheme, and amended SEARs are listed. Next, the proponent prepares an environmental impact statement (EIS), which is then exhibited for public submissions. No submissions have been made yet. The department then assesses the project.

Estimated development cost (upper figure)
$5bnAldington Road Data Centre_Scoping Report
IT load (upper end)
360 MWAldington Road Data Centre_Scoping Report
Maximum building height
36 mAldington Road Data Centre_Scoping Report
Building storeys
3 storeysAldington Road Data Centre_Scoping Report
Site area
30 haAldington Road Data Centre_Scoping Report
Developable area
14 haAldington Road Data Centre_Scoping Report
Substation capacity
1,000 MVAAldington Road Data Centre_Scoping Report

The portal gives no description.

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.