Advanced Waste Treatment (AWT) Facility

Decided: approved on 16 Apr 2008Waste

Where it is in the process

Approved on 16 Apr 2008

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination16 Apr 2008 (done)
  8. Approved16 Apr 2008

What it proposes

The department's description

Kemps Creek Advanced Waste Treatment Facility

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

4 changes to the project after its decision, each assessed as a case of its own, newest first.

Modification 4 - Site Layout and Leachate TreatmentMP06_0185-Mod-4

Under way: at assessment

The modification proposes to reduce the area of the Advanced Waste Treatment Facility site to accommodate an expansion to the Elizabeth Drive Landfill, and provide leachate treatment infrastructure to replace leachate ponds to be removed as part of

Its 14 documents

14 documents in 3 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information8

See the 8 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Increase Annual InputMP06_0185-Mod-2

Withdrawn: withdrawn

Its 2 documents

2 documents in 1 folder, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 3 - Maturation Pad UpgradesMP06_0185-Mod-3

Decided: approved with conditions on 24 Jan 2014 by Dir(Metro/Reg-N)

Its 6 documents

6 documents in 3 folders, each on the NSW Planning Portal

EA1

See the document on the Planning Portal

Submissions2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Operating HoursMP06_0185-Mod-1

Decided: approved on 20 Sep 2010 by the department (executive director)

Its 5 documents

5 documents in 2 folders, each on the NSW Planning Portal

Application3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

38 documents in 7 folders, each on the NSW Planning Portal

Application2
Request for DGRS1
EA18
Response to Submissions1
Determination2
Management Plans and Strategies4
Reports10