State significant development

Youth Hostel & Archaeological Centre

Youth hostel and archaeological centre, Cumberland St, The Rocks

Decided: approved on 23 Jan 2008Mixed useLocal scale

Where it is in the process

Approved on 23 Jan 2008

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination23 Jan 2008 (done)
  8. Approved23 Jan 2008

What it proposes

AI summary. Written from this project's page and its Assessment report.pdf and Instrument of Approval.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Youth hostel and archaeological centre, Cumberland St, The Rocks

The project is a 3-4 storey youth hostel with 106 ensuite bedrooms and 354 beds, and a single storey archaeological education centre. It is on "The Dig" site at 110-128 Cumberland Street, The Rocks, in the City of Sydney. The site is about 2,675 m² and holds exposed archaeological remains. The hostel has 4,714.3 m² of floor area and the education centre 221.6 m². The estimated cost is $13,500,000. No car parking is proposed.

The project application was exhibited for 30 days from 13 Sep 2007 to 12 Oct 2007. The department received 5 submissions from public authorities and 3 from local residents. The portal lists no public submissions. The department's report of December 2007 recommended approval, subject to modifications. It noted minor breaches of the height control. The Minister for Planning approved it on 23 Jan 2008, with conditions. Next, the proponent must meet those conditions, including heritage and construction hours, before building and occupation.

Capital investment
$13.5MAssessment report.pdf
Hostel beds
354 bedsAssessment report.pdf
Ensuite bedrooms
106 bedroomsAssessment report.pdf
Site area
2,675 m²Assessment report.pdf
Youth hostel floor area
4,714.3 m²Assessment report.pdf
Education centre floor area
221.6 m²Assessment report.pdf

The portal gives no description.

Modifications

5 changes to the project after its decision, each assessed as a case of its own, newest first.

YHA Mod 5 - Extension of trial periodMP06_0265-Mod-5

Decided: approved on 4 Feb 2025 by the department (team leader)

Modification seeking continuation of operational hours for terraces approved as a trial period under MOD 4

Its 12 documents

12 documents in 4 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

YHA MOD 4 - Extension of operating hoursMP06_0265-Mod-4

Decided: approved on 8 Sep 2023 by the department (director) · 10 submissions

Extend the hours of use of the Level 1 terrace and Level 3 roof top terrace to allow their use until 12.00 am Monday to Sunday

Its 19 documents

19 documents in 5 folders, each on the NSW Planning Portal

Response to Submissions9

See the 9 documents on the Planning Portal

Agency Advice4

See the 4 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Recommendation2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Mod 3 - Hours of OperationMP06_0265-Mod-3

Decided: approved on 29 Jul 2015 by the department (director)

Its 11 documents

11 documents in 3 folders, each on the NSW Planning Portal

Application8

See the 8 documents on the Planning Portal

Submissions1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Roof + Balcony ChangesMP06_0265-Mod-2

Decided: approved on 22 Nov 2011 by Dir(Metro/Reg-N)

Its 12 documents

Its page on the Planning Portal

Mod 1 - Roof PlantMP06_0265-Mod-1

Decided: approved on 26 Apr 2009 by the department (director-general)

Its 12 documents

12 documents in 2 folders, each on the NSW Planning Portal

Application4

See the 4 documents on the Planning Portal

Determination8

See the 8 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.