Decided: approved on 16 Mar 2012Waste

Where it is in the process

Approved on 16 Mar 2012

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination16 Mar 2012 (done)
  8. Approved16 Mar 2012

What it proposes

The portal gives no description.

Modifications

8 changes to the project after its decision, each assessed as a case of its own, newest first.

Woodlawn Bioreactor Expansion MOD 8 - Tank Farm 2MP10_0012-Mod-8

Under way: at prepare mod report

Construction and operation of eight 13.5-megalitre leachate storage tanks (known as Tank Farm 2)

Its 10 documents

10 documents in 3 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

SEARs2

See the 2 documents on the Planning Portal

Agency Advice7

See the 7 documents on the Planning Portal

Its page on the Planning Portal

Woodlawn Bioreactor - Modification 7MP10_0012-Mod-7

Under way: at assessment · 20 submissions

Construction and operation of a reverse osmosis plant (ROP) adjacent to the existing leachate treatment plant. Transfer of treated water (permeate) from the ROP via pipeline and irrigation of permeate on grazing lands.

Its 36 documents

36 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

SEARs3

See the 3 documents on the Planning Portal

Modification Application12

See the 12 documents on the Planning Portal

Response to Submissions7

See the 7 documents on the Planning Portal

Agency Advice12

See the 12 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Its page on the Planning Portal

Woodlawn Bioreactor Modification 5MP10_0012-Mod-5

Withdrawn: withdrawn

Amendment to contingency measures for managing leachate.

Its page on the Planning Portal

Woodlawn Bioreactor Expansion MOD 6 - BioreactorMP10_0012-Mod-6

Decided: approved on 5 Sep 2025 by the department (director) · 5 submissions

The modification originally involved construction and operation of a new 52- megalitre leachate dam. The modification has now been amended and the leachate dam is to be replaced by four 13.5-megalitre leachate storage tanks.

Its 73 documents

Its page on the Planning Portal

Woodlawn Bioreactor Expansion MOD 4 - Bush FireMP10_0012-Mod-4

Decided: approved on 16 Mar 2020 by the department (director)

Modification to temporarily allow the site to receive up to 200,000m3 of waste from bush fire impacted areas in NSW until 30 September 2020

Its 7 documents

7 documents in 2 folders, each on the NSW Planning Portal

Determination6

See the 6 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Woodlawn Bioreactor Expansion MOD 3 - Solid FuelMP10_0012-Mod-3

Decided: approved on 9 Apr 2019 by the department (executive director) · 14 submissions

Construction and operation of a solid recovery fuel facility adjacent to Woodlawn Bioreactor.

Its 18 documents

18 documents in 4 folders, each on the NSW Planning Portal

EA9

See the 9 documents on the Planning Portal

Response to Submissions3

See the 3 documents on the Planning Portal

Recommendation3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Woodlawn Bioreactor Expansion MOD 2 - LeachateMP10_0012-Mod-2

Decided: approved on 22 Dec 2017 by the department (director) · 8 submissions

Long-term leachate management system

Its 25 documents

25 documents in 4 folders, each on the NSW Planning Portal

Application13

See the 13 documents on the Planning Portal

Submissions9

See the 9 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Woodlawn Bioreactor Expansion MOD-1 Leachate ManagementMP10_0012-Mod-1

Decided: approved on 9 Sep 2016 by the department (executive director) · 1 submission

Short-term leachate management strategy

Its 17 documents

17 documents in 4 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Submissions10

See the 10 documents on the Planning Portal

Response to Submissions2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project