On the map
State significant development

Weston Aluminium Additional Waste Streams

A hazardous waste facility at Weston Aluminium, Kurri Kurri

Decided: approved on 20 Nov 2025WasteMinor scale

Where it is in the process

Approved on 20 Nov 2025

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination20 Nov 2025 (done)
  9. Approved20 Nov 2025

What it proposes

AI summary. Written from this project's page and its Instrument of Consent and Weston Aluminium Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A hazardous waste facility at Weston Aluminium, Kurri Kurri

Weston Aluminium Pty Ltd proposed a waste management facility at its existing site at 129 Mitchell Street, Kurri Kurri, in the Cessnock City area. It would receive, store and treat up to 8,750 tonnes a year of liquid and solid industrial waste, including hazardous waste, inside an upgraded existing building on about 1 ha. The estimated development cost is $3.3 million, with 6 construction jobs and 9 operational jobs. The nearest homes are about 320 m away.

The environmental impact statement was exhibited from 8 Feb 2023 to 7 Mar 2023 and drew 53 submissions: 49 objecting, 1 supporting and 3 commenting. The proponent responded and revised the layout. The department's assessment, which focused on hazards and risk, recommended approval. An Executive Director of the department, acting for the Minister, approved it on 20 Nov 2025 with conditions. Next, the proponent must prepare hazard, fire safety and air quality plans before building and operating.

Waste capacity
8,750 tonnes a yearWeston Aluminium Assessment Report
Estimated development cost
$3.3MWeston Aluminium Assessment Report
Construction jobs
6 jobsWeston Aluminium Assessment Report
Operational jobs
9 jobsWeston Aluminium Assessment Report
Site area
1 haWeston Aluminium Assessment Report
Maximum dangerous goods stored
240 tonnesWeston Aluminium Assessment Report
Waste types accepted
50 waste typesWeston Aluminium Assessment Report
Vehicles a day
12 vehiclesWeston Aluminium Assessment Report

The department's description

The proposal seeks to permit the receival, consolidation, storage and processing of additional waste stream at

WA’s facility at Kurri Kurri

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

53 submissions: 52 from the public and 1 from public authorities

Object49
Support1
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

62 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS17
Response to Submissions13
Agency Advice20
Additional Information4
Recommendation3
Determination2