On the map
State significant development

Waterloo Estate (South), Stage 1, Block 9

Two buildings with 500 homes at 339-341 George St, Waterloo

Under way: at prepare eisMixed useDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Waterloo South Block 9 Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two buildings with 500 homes at 339-341 George St, Waterloo

The proponent proposes to redevelop Block 9 of Waterloo Estate (South) at 339-341 George Street, Waterloo, in the City of Sydney. It seeks approval for about 500 dwellings in two buildings: a 16-storey residential tower of social housing and a part 10-storey, part 33-storey building of market housing. Shops, including a supermarket, would sit on the lower levels. Plans also include three basement levels, subdivision and public domain works on a site of about 7,345 m². No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). A scoping report dated 28 Apr 2026 asked for the Secretary's environmental assessment requirements (SEARs), which have been issued and later amended. Next, the proponent prepares and lodges the EIS, which is then exhibited so the public can make submissions. No submissions have been made yet. The department then assesses it.

New dwellings
500 dwellingsWaterloo South Block 9 Scoping Report
Social housing tower height
16 storeysWaterloo South Block 9 Scoping Report
Market housing building: most storeys
33 storeysWaterloo South Block 9 Scoping Report
Basement levels
3 levelsWaterloo South Block 9 Scoping Report
Site area
7,345 m²Waterloo South Block 9 Scoping Report

The department's description

Redevelopment of Block 9 of the Waterloo South (Estate) comprising construction of two buildings with 500 dwellings, three basement levels, and non-residential uses, subdivision, infrastructure, site preparation, early w public domain work

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.