On the map
State significant infrastructure

Warragamba Dam Environmental Flows

Withdrawn: withdrawnWater and sewerage

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Installation of new, and refurbishment of existing, infrastructure to allow Environmental flow (E-flows) releases of water to occur from Warragamba Dam.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

17 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

SEARs1

See the document on the Planning Portal

Agency Advice15

See the 15 documents on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.