On the map
State significant development

Ravenswood Cemetery

A cemetery for up to 250,000 burial plots at Wallacia

Under way: at prepare eisMixed useDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report - Wallacia Cemetery on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A cemetery for up to 250,000 burial plots at Wallacia

The proponent proposes a cemetery on three lots of about 200.91 ha at Wallacia, mostly in Liverpool City with part in Penrith. It is a concept masterplan with a detailed first stage, to be built over 6 stages. Stage 1 would have about 40,000 burial plots, and the whole site between 220,000 and 250,000. It would include chapels, a function centre, a gatehouse, administration buildings, a café, parking and access roads. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report dated October 2022 asked for the Secretary's environmental assessment requirements (SEARs), which have since been issued and later modified and supplemented. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions. The department then assesses it, and the Minister is expected to decide, unless the Independent Planning Commission does.

Burial plots (whole site, upper end)
250,000 burial plotsPortal page
Stage 1 burial plots
40,000 burial plotsScoping Report - Wallacia Cemetery
Site area
200.91 haScoping Report - Wallacia Cemetery
Construction stages
6 stagesScoping Report - Wallacia Cemetery

The department's description

The proposal is for a concept masterplan for a cemetery which would provide for up to 250,000 burial plots

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.