Victoria to NSW Interconnector West
New 500 kV transmission line, Murrabit to Dinawan and Wagga
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its EIS Main Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
New 500 kV transmission line, Murrabit to Dinawan and Wagga
Transgrid proposes the NSW part of the Victoria to NSW Interconnector West (VNI West). It would build new 500 kV double circuit transmission lines along a corridor around 240 km long, from the NSW and Victoria border near Murrabit to the new Dinawan substation near Coleambally. It would also replace the existing 330 kV line for around 9 km, between the Wagga substation and the future Gugaa substation, in the Wagga Wagga area. No capital investment or job numbers are stated.
The environmental impact statement (EIS) is dated 24 Jul 2025. It drew 122 submissions: 113 objecting, 1 supporting and 8 commenting. The proponent has since amended the project and answered a request for additional information. The case is now at the stage where more information is required. Next, the department continues its assessment with advice from other agencies, then makes a recommendation and a decision.
- Transmission corridor length (Murrabit to Dinawan)
- 240 kmEIS Main Report
- Wagga to Gugaa substation section length
- 9 kmEIS Main Report
- Submissions
- 122 submissionsPortal page
- Submissions objecting
- 113 submissionsPortal page
The department's description
Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
122 submissions: 106 from the public, 13 from organisations and 3 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
123 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Application7
SEARs20
- Airservices - Advice on SEARs_Redacted
- BCS + NPWS - Advice on SEARs
- CASA - Advice on SEARs
- CSSI Statement of Reasons and Declaration
- Crown Lands - Advice on SEARs
- DPHI Agriculture - Advice on SEARs
- DPI Fisheries - Advice on SEARs
- EPA - Advice on SEARs
- Edward River Council - Advice on SEARs
- FRNSW - Advice on SEARs
- Heritage Council - Advice on SEARs
- Heritage NSW ACH- Advice on SEARs
- MEG - Advice on SEARs
- Murrumidgee Council - Advice on SEARs
- SSD-SSI Issued SEARs 2025
- Subsidence Advisory - Advice on SEARs
- TfNSW - Advice on SEARs
- Wagga Council - Advice on SEARs
- Water Group - Advice on SEARs
- Water NSW - Advice on SEARs
EIS33
- Application Addendum - Project Cost Correction
- Application Form
- EIS Main Report
- EIS Summary
- Technical Report 1 - BDAR (Part 1)
- Technical Report 1 - BDAR (Part 2 Figures 2 of 2)
- Technical Report 1 - BDAR (Part 3)
- Technical Report 1 -BDAR (Part 2 Figures 1 of 2)
- Technical Report 10 - Groundwater
- Technical Report 11 - Non-Aboriginal Heritage
- Technical Report 12 - Bushfire
- Technical Report 13 - Electric and Magnetic Fields
- Technical Report 14 - Aviation
- Technical Report 15 - Air Quality
- Technical Report 16 - Greenhouse Gas
- Technical Report 17 - Contaminated Land
- Technical Report 2 - Aboriginal Heritage
- Technical Report 3 - Landscape Visual (Part 1)
- Technical Report 3 - Landscape Visual (Part 2)
- Technical Report 3 - Landscape Visual (Part 3)
- Technical Report 3 - Landscape Visual (Part 4)
- Technical Report 3 - Landscape Visual (Part 5)
- Technical Report 4 - Agriculture
- Technical Report 5 - Social
- Technical Report 6 - Economic
- Technical Report 7 - Noise and Vibration (Part 1)
- Technical Report 7 - Noise and Vibration (Part 2)
- Technical Report 7 - Noise and Vibration (Part 3)
- Technical Report 8 - Traffic and Transport
- Technical Report 9 - Hydrology and Flooding (Part 1)
- Technical Report 9 - Hydrology and Flooding (Part 2)
- Technical Report 9 - Hydrology and Flooding (Part 3)
- Technical Report 9 - Hydrology and Flooding (Part 4)
Response to Submissions2
Agency Advice26
- Advice on EIS - Defence
- EIS Advice - AirServices
- EIS Advice - CASA
- EIS Advice - CPHR
- EIS Advice - Coleambally Irrigation Authority
- EIS Advice - Crown Lands
- EIS Advice - DCCEEW Water Group
- EIS Advice - DPIRD Agriculture
- EIS Advice - DPIRD Fisheries
- EIS Advice - DPIRD Resources
- EIS Advice - EPA
- EIS Advice - Edward River Council
- EIS Advice - Energy Co
- EIS Advice - Fire & Rescue NSW
- EIS Advice - Heritage Council
- EIS Advice - Heritage NSW (ACH)
- EIS Advice - MDBA
- EIS Advice - Murray River Council
- EIS Advice - NPWS
- EIS Advice - NSW SES
- EIS Advice - RFS
- EIS Advice - TfNSW
- EIS Advice - TfNSW Attachment 2
- EIS Advice - Water NSW
- EIS Comment - Murrumbidgee Council
- EIS Comment – Wagga Council
Amendments18
- Amended Application Form
- Amendment Acceptance Letter
- Technical paper 11 - Addendum Non-Aboriginal heritage
- Technical paper 15 - Addendum air quality impact assessment
- Technical paper 1a – Revised BDAR - Main Report
- Technical paper 1b – Revised BDAR - Figures
- Technical paper 1c – Revised BDAR- Appendices
- Technical paper 2 – Revised ACHAR (Public)
- Technical paper 3 - Addendum landscape character and visual
- Technical paper 5 - Addendum social impact assessment
- Technical paper 7 - Addendum NVIA
- Technical paper 8a - Revised TTIA - Main Report
- Technical paper 8b - Revised TTIA - Appendix F-G
- Technical paper 9a – Revised HFWQIA- Main Report
- Technical paper 9b – Revised HFWQIA - Appendix B
- Technical paper 9c – Revised HFWQIA - Appendix C
- Technical paper 9d – Revised HFWQIA - Appendix D
- VNI West (NSW) Amendment Report
Additional Information16
- Attachment B - Response to DCA Water Advisory Advice
- Attachment C - Response to NSW SES Advice
- Attachment D - Response to DPIRD Fisheries Advice
- Attachment E - Response to DPIRD Biosecurity Advice
- Attachment F - Response to Accomodation early works RFI
- Attachment G - Response to DPHI Tarcutta TWA RFI
- Request for Additional Information
- Revised BDAR Part A (Main Report)
- Revised BDAR Part B
- Revised BDAR Part C
- Revised BDAR Part D1
- Revised BDAR Part D2
- Revised BDAR Part E1
- Revised BDAR Part E2
- Revised BDAR Part E3
- VNI West Response to DPHI RFI Cover Letter
What's near it
Where it is
- Suburb
- Wanganella
- Council areas
- Edward River, Murray River, Murrumbidgee, Wagga Wagga
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.