On the map
State significant infrastructure

Victoria to NSW Interconnector West

New 500 kV transmission line, Murrabit to Dinawan and Wagga

Under way: at assessmentTransmissionRegional scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS Main Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

New 500 kV transmission line, Murrabit to Dinawan and Wagga

Transgrid proposes the NSW part of the Victoria to NSW Interconnector West (VNI West). It would build new 500 kV double circuit transmission lines along a corridor around 240 km long, from the NSW and Victoria border near Murrabit to the new Dinawan substation near Coleambally. It would also replace the existing 330 kV line for around 9 km, between the Wagga substation and the future Gugaa substation, in the Wagga Wagga area. No capital investment or job numbers are stated.

The environmental impact statement (EIS) is dated 24 Jul 2025. It drew 122 submissions: 113 objecting, 1 supporting and 8 commenting. The proponent has since amended the project and answered a request for additional information. The case is now at the stage where more information is required. Next, the department continues its assessment with advice from other agencies, then makes a recommendation and a decision.

Transmission corridor length (Murrabit to Dinawan)
240 kmEIS Main Report
Wagga to Gugaa substation section length
9 kmEIS Main Report
Submissions
122 submissionsPortal page
Submissions objecting
113 submissionsPortal page

The department's description

Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

122 submissions: 106 from the public, 13 from organisations and 3 from public authorities

Object113
Support1
Comment8

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

123 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application7
SEARs20
EIS33
Response to Submissions2
Agency Advice26
Amendments18
Additional Information16

What's near it

Where it is

Suburb
Wanganella
Council areas
Edward River, Murray River, Murrumbidgee, Wagga Wagga

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.