On the map
Part 4 development

Ulan Coal - Ventilation shaft

Decided: approved on 18 Dec 1999Mining

Where it is in the process

Approved on 18 Dec 1999

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination18 Dec 1999 (done)
  10. Approved18 Dec 1999

What it proposes

The portal gives no description.

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

1 document in 1 folder, each on the NSW Planning Portal

Determination1

See the document on the Planning Portal

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.