On the map
State significant infrastructure

Toukley Desalination Water Treatment Plant

A 40 ML a day desalination plant at Noraville, Central Coast

Under way: at prepare eisWater and sewerageNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Supplementary SEARs Cover Letter on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 40 ML a day desalination plant at Noraville, Central Coast

The proposal is to build and run a desalination plant at 85 Oleander St, Noraville, in the Central Coast Council area. It would include a seawater extraction pipeline, a brine discharge pipeline using an existing ocean outfall, pumping stations and a connection to the existing drinking water network. The design capacity is 40 ML a day, changed from the 30 ML a day in the scoping report. No capital investment or job numbers are stated.

The project is at the stage of preparing an environmental impact statement (EIS). Supplementary requirements for the EIS (SEARs) were issued on 6 May 2026, after the Commonwealth Minister for the Environment decided it is a controlled action under national environment law. No public submissions have been made. Next, the proponent exhibits the EIS, the public can make submissions, and the department then assesses the project.

Design capacity
40 ML a daySupplementary SEARs Cover Letter
Earlier design capacity in the scoping report
30 ML a daySupplementary SEARs Cover Letter

The department's description

Construction and operation of a desalinisation plant, including seawater extraction pipeline, brine discharge via pipeline and an existing ocean outfall, pumping stations, connection to existing potable water supply network, and ancillary works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.