Teralba Waste Facility

Decided: approved on 27 Sep 2011Waste

Where it is in the process

Approved on 27 Sep 2011

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination27 Sep 2011 (done)
  10. Approved27 Sep 2011

What it proposes

The portal gives no description.

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Teralba Waste Facility MOD 1 - Layout ChangesMP08_0079-Mod-1

Decided: approved on 11 Dec 2019 by the department (director)

Alterations to approved site layout including: weighbridges, car park, office, storage shed, product bins, and monitoring wells , asphalt recycling plant and concrete batching plant. Changes to intersection design and access.

Its 15 documents

15 documents in 3 folders, each on the NSW Planning Portal

Agency Advice7

See the 7 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.