Tallawarra A Power Station Efficiency Upgrade

Efficiency upgrade to the Tallawarra A Power Station, Yallah

Decided: approved on 6 Feb 2024Energy: otherDistrict scale

Where it is in the process

Approved on 6 Feb 2024

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination6 Feb 2024 (done)
  9. Approved6 Feb 2024

What it proposes

AI summary. Written from this project's page and its Assessment Report and Development Consent on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Efficiency upgrade to the Tallawarra A Power Station, Yallah

The project would upgrade the existing Tallawarra A gas-fired power station on Yallah Bay Road, Yallah, in the Wollongong City Council area. It would replace compressor blades, combustion hardware and steam turbine components, raising the nominal output from 400 MW to 440 MW. The work would be within the existing site, over about two months in April and May 2024, with up to 150 construction staff. The capital investment is approximately $39 million. It would not change the approved fuel, natural gas.

The environmental impact statement (EIS) was exhibited and drew 6 submissions: 2 objecting, 2 supporting and 2 commenting. Objections raised Aboriginal cultural heritage and air quality. The department's assessment found the impacts minor and recommended approval. The department's Director, Resource Assessments, acting for the Minister, approved it on 6 Feb 2024, with conditions. Next, the proponent must meet those conditions, including an environmental management strategy, before work starts.

Capital investment
$39MAssessment Report
Nominal output after upgrade
440 MWAssessment Report
Increase in output
40 MWAssessment Report
Peak construction workforce
150 jobsAssessment Report
Heavy vehicle movements
12 movementsAssessment Report

The department's description

Upgrade the Tallawarra A Power Station to increase the nominal output from approximately 400 MW to 440 MW.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

6 submissions: 4 from the public and 2 from public authorities

Object2
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.