On the map
Part 3A project

Sydney Opera House - Pedestrian Safety

Decided: approved on 10 Dec 2010Tourism and recreation

Where it is in the process

Approved on 10 Dec 2010

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination10 Dec 2010 (done)
  10. Approved10 Dec 2010

What it proposes

The portal gives no description.

Modifications

2 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 2 - Further Design ChangesMP09_0200-Mod-2

Decided: approved with conditions on 11 Feb 2013 by Dir(Metro/Reg-N)

Its 20 documents

20 documents in 4 folders, each on the NSW Planning Portal

Application7

See the 7 documents on the Planning Portal

Submissions1

See the document on the Planning Portal

Agency Submissions2

See the 2 documents on the Planning Portal

Determination10

See the 10 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Design ChangesMP09_0200-Mod-1

Decided: approved on 20 Feb 2012 by Dir(Metro/Reg-S)

Its 8 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.