Stratford Pumped Hydro and Solar

A 300 MW pumped hydro and 320 MW solar project at Stratford

Decided: approved on 10 Jul 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 10 Jul 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination10 Jul 2026 (done)
  9. Approved10 Jul 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Approval on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 MW pumped hydro and 320 MW solar project at Stratford

The project is a pumped hydro energy storage and generation station of up to 300 MW and 3,600 MWh, with a 320 MW solar farm, on the Stratford Mining Complex at 3364 The Bucketts Way, Stratford, in the Mid-Coast Council area. It includes a new upper reservoir, tunnels, an underground powerhouse and an on-site substation. The disturbance area is 870 ha. Construction would take around 4 years, with up to 350 construction jobs and 10 operational jobs.

The environmental impact statement (EIS) was exhibited from 2 Oct 2024 and drew 96 submissions: 75 objecting, 17 supporting and 4 commenting. The proponent responded and gave further information in 2025 and 2026. The department's assessment found the project approvable subject to conditions, and the Minister approved it on 10 Jul 2026. Next, the proponent must meet the conditions, including management plans, before construction. The existing 132 kV transmission line would need upgrading under a separate approval.

Pumped hydro power capacity
300 MWAssessment Report
Pumped hydro storage capacity
3,600 MWhAssessment Report
Solar farm capacity
320 MWAssessment Report
Disturbance area
870 haAssessment Report
Construction jobs
350 jobsAssessment Report
Operational jobs
10 jobsAssessment Report

The department's description

Development of a 300 MW pumped hydro energy storage and generation project, 320 MW solar farm, grid connection and ancillary infrastructure. This project has been declared Critical State Significant Infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

96 submissions: 88 from the public, 7 from organisations and 1 from public authorities

Object75
Support17
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

107 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application2
SEARs19
EIS25
Response to Submissions15
Agency Advice29
Additional Information13
Determination3

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.